My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6605 MERRILL CREEK PKY 2017-06-22
>
Address Records
>
MERRILL CREEK PKY
>
6605
>
6605 MERRILL CREEK PKY 2017-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2017 11:25:41 AM
Creation date
6/22/2017 11:25:32 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6605
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 3 <br /> 2/15/2015 12:51 <br /> Issued By WMW WARD,MICHAEL W. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 10/7/2014 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 673 <br /> Program <br /> Title REPAIR EIGHT INCH 6605 MERRILL CRK PKY 710119673 <br /> Wort: Order No 20143100 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 10/7/2014 Time 15:03 Original WO 20143099 Billing <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> V J0034 1999 FORD 1 1/2 TON SERVICE TR 1.5 14.7 10/09/2014 <br /> V J0039 1999 FORD 1 1/2 TON SVC TRUCK 3 29.4 10/09/2014 <br /> Total Vehicle Cost $44.10 <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date V1 <br /> M COUP46047147 COUPLING 8 MJ X 8 MJ DI SLEEVE 2 187.396 10/08/2014 1 <br /> M MEGA46044347 MEGALUG 8 KIT 4 191.716 10/08/2014 1 <br /> Total Material Cost $379.12 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> P CAD CROTTS,AARON D. 3 108.948 10/06/2014 <br /> P CAD CROTTS,AARON D. 3 108.948 10/07/2014 <br /> P MWE MOORE,WARREN E. 3 95.88 10/09/2014 <br /> P RBN ROBERTS,BRIAN N. 3 80.793 10/09/2014 <br /> P SCR SMITH,CAMERON R. 3 73.242 10/09/2014 <br /> Total Personnel Cost $467.81 <br /> Total Cost $891.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.