Laserfiche WebLink
To meet this increased water demand and to correct existing <br /> system deficiencies, a $93 , 000, 000 capital improvement program is <br /> recommended in Section 12 . This capital improvement program <br /> includes: 68 miles of distribution mains ranging in size from 8-inch <br /> to 36-inch; 36 miles of transmission main rehabilitation; 23 miles of <br /> new transmission main construction; and a $10, 000, 000 treatment plant <br /> expansion. <br /> The capital improvement program developed in this plan is highly <br /> dependent upon the timing, location, and nature of future <br /> development. If future development proceeds in a manner <br /> significantly different from the projections supplied by the City of <br /> Everett and Snohomish County Planning Departments, major revisions to <br /> the capital improvements program contained within will be needed. <br /> Future development must therefore be continuously monitored for <br /> compatibility with the development patterns assumed in this plan. <br /> 12 <br /> 1-2 <br />