My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1215 W MUKILTEO BLVD 2017-07-28
>
Address Records
>
W MUKILTEO BLVD
>
1215
>
1215 W MUKILTEO BLVD 2017-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2017 7:20:24 AM
Creation date
6/22/2017 1:40:24 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1215
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ffl'L <br /> TIMA 1 h-WA GEOSCIENCES INC. <br /> January 19,2016 <br /> HWA Project No. 2014-162-21 <br /> Howard&Frances Lorentz <br /> 1215 West Mukilteo Boulevard <br /> Everett Washington 98203 <br /> Attention: Howard and Frances Lorentz <br /> Subject: SUMMARY REPORT OF GEOTECHNICAL SPECIAL INSPECTIONS <br /> Lorentz Rockery Replacement <br /> 1215 West Mukilteo Boulevard <br /> Everett,Washington <br /> Dear Lorentz's; <br /> As requested,HWA GeoSciences Inc. (I-MA)provided Geotechnical Special Inspections,for <br /> the above-referenced project. The wall Contractor for the project was By Design Rockeries of <br /> Duvall, Washington. Construction began on December 11th 2015 and was competed on <br /> December 16th 2015. <br /> Our geotechnical special inspections were completed as recommended in our geotechnical <br /> report. A copy of our geotechnical report is included an Appendix A of this summary report. <br /> Our inspections were completed on a full-time basis through construction of the Rockery. Daily <br /> field reports were prepared after each site visit. Copies of all of our field reports are included in <br /> Appendix B of this Summary Report. Brief descriptions of our Geotechnical Special Inspection <br /> items are presented in the following paragraphs. <br /> 1. Observe and monitor excavation.We observed the removal of the existing degrading <br /> rockery to make way for the new rockery. To avoid opening up the entire wall alignment, <br /> the removal of the old rockery was completed in sections as the new rockery was <br /> constructed. This work was completed between December 11th and December 16'h of 2015. <br /> To the best of our knowledge,all excavations were completed per the recommendations <br /> provided in our geotechnical report. <br /> 2. Wall drainage installation. We observed installation of the drain located behind the newly <br /> constructed rockery. In general,to the best of our knowledge, all subsurface drainage <br /> elements were constructed in accordance with the recommendations provided in our <br /> geotechnical report. <br /> 21312 30th.Drive SE <br /> Suite 110 <br /> Bothell,'AA 98021.7010 <br /> Tel: 425.774.0106 <br /> Fax: <br /> mmm.hivageoxoin. <br /> Begin >>>>>>>>>>>>>>>>>>>>>>>>>> <br />
The URL can be used to link to this page
Your browser does not support the video tag.