Laserfiche WebLink
January 19,2016 <br /> HWA Project No. 2014-162-21 <br /> In summary,we certify that,to the best of our knowledge, the project was completed in general <br /> accordance with our recommendations and wall plans. We appreciate having had the <br /> opportunity to provide geotechnical engineering and inspection services on this project. If you <br /> have any questions or if we may be of further assistance please, contact the undersigned at (425) <br /> 774-0106. <br /> Sincerely, <br /> HWA GEOSCIENCES INC. <br /> P�pJ. Hli <br /> OV <br /> 46961��0 <br /> SSSIONAU <br /> Donald J. Huling,P.E. <br /> Geotechnical Engineer,Principal <br /> Attachments: <br /> Figure 1 Final Rockery Configuration <br /> Appendices: <br /> Appendix A HWA's geotechnical report dated April 29"2015 <br /> Appendix B Field Reports <br /> 3 <br /> Summary Letter HWA GeoSciences Inc. <br />