My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3233
>
Resolutions
>
Resolution 3233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 9:36:47 AM
Creation date
6/27/2017 9:36:46 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3233
Date
10/11/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44/7 <br /> EXHIBIT B <br /> I. The following is a summary of the ESTIMATED costs of the proposed <br /> street improvement project. These are simply estimates and are <br /> only intended to give prospective signatories an idea of the <br /> MAGNITUDE of project cost. These costs may, in reality, be more <br /> or less, depending upon the outcome of the project design and the <br /> construction bids, and various other factors. <br /> 1. ENGINEERING/SURVEYING $ 78,262 <br /> 2. CONSTRUCTION/INSPECTION 1,116,553 <br /> 3 . RIGHT-OF-WAY ACQUISITIONS 10,000 <br /> 4. FIN. , ADMIN. , & LEGAL COSTS1 360 , 124 <br /> 5. ESTIMATED TOTAL COST $1, 564,939 <br /> II. The total acreage of property included within the proposed LID <br /> boundaries is approximately 38 . 58 acres. The preliminary <br /> assessment roll would most likely be apportioned on the basis of <br /> square footage. The final assessment roll may be spread on the <br /> basis of square footage or a special benefit study. <br /> llncludes an eight-percent contribution tothe <br /> escitycity's <br /> snGuaranty 002Fund to <br /> secure the outstanding LID assessments, per <br />
The URL can be used to link to this page
Your browser does not support the video tag.