Laserfiche WebLink
44/7 <br /> EXHIBIT B <br /> I. The following is a summary of the ESTIMATED costs of the proposed <br /> street improvement project. These are simply estimates and are <br /> only intended to give prospective signatories an idea of the <br /> MAGNITUDE of project cost. These costs may, in reality, be more <br /> or less, depending upon the outcome of the project design and the <br /> construction bids, and various other factors. <br /> 1. ENGINEERING/SURVEYING $ 78,262 <br /> 2. CONSTRUCTION/INSPECTION 1,116,553 <br /> 3 . RIGHT-OF-WAY ACQUISITIONS 10,000 <br /> 4. FIN. , ADMIN. , & LEGAL COSTS1 360 , 124 <br /> 5. ESTIMATED TOTAL COST $1, 564,939 <br /> II. The total acreage of property included within the proposed LID <br /> boundaries is approximately 38 . 58 acres. The preliminary <br /> assessment roll would most likely be apportioned on the basis of <br /> square footage. The final assessment roll may be spread on the <br /> basis of square footage or a special benefit study. <br /> llncludes an eight-percent contribution tothe <br /> escitycity's <br /> snGuaranty 002Fund to <br /> secure the outstanding LID assessments, per <br />