My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 COLBY AVE PEOPLES BANK 2021-04-20
>
Address Records
>
COLBY AVE
>
2702
>
PEOPLES BANK
>
2702 COLBY AVE PEOPLES BANK 2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 3:52:29 PM
Creation date
6/28/2017 9:21:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2702
Tenant Name
PEOPLES BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P U B L I C i111/0 RKS P E RM I T Date: 5/22/2015 <br /> Public Works Permit#: PW1505-037 <br /> City of Everett Public Works Department <br /> ���.� 3200 Cedar Street Building Permit#; B1505-062 <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 2,357.69 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PEOPLES BANK PEOPLES BANK <br /> 3100 WOBURN ST 3100 WOBURN ST <br /> BELLINGHAM �/�/q gg22g BELLINGHAM Wq 98228 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00439162403000 SITE ADDRESS: 2702 COLBY AVE <br /> DESCRIPTION OF PROPOSED WORK: <br /> SITE IMPROVEMENTS-PEOPLES BANK <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 8/20/2015. <br /> w <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction [� <br /> and with other inspection requests. See attached to request and inspection. �"� <br /> � <br /> 6. Provide traffic control plan per City of Everett/MUTCD standards prior to starting construction. � <br /> � <br /> Public Works Fee Breakdown: h <br /> PW Plan Review $770.40 Z <br /> PW Site Inspection $1,540.80 O <br /> ASphalt paving $46.49 <br /> � <br /> � <br /> � <br /> � <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of i:he improvement <br /> � � /�/J or other right-of-way use hereto applied for and further agrees <br /> � to remove same upon notice from the City and to replace <br /> A ro ed for Constr ion D e p lic property damaged ther by. <br /> � ,��J % � <br /> \ � L'._ • <br /> FINAL INSPECTION Date � � � / - }' � � l� <br /> Approved as Constructed 'Si,gnature ` Applicant � Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DRx'E PERMIT IS ISSUED AND H AF�T IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT 0\/ER 90 DAYS DURATION. <br /> V� ��L <br />
The URL can be used to link to this page
Your browser does not support the video tag.