My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 COLBY AVE PEOPLES BANK 2021-04-20
>
Address Records
>
COLBY AVE
>
2702
>
PEOPLES BANK
>
2702 COLBY AVE PEOPLES BANK 2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 3:52:29 PM
Creation date
6/28/2017 9:21:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2702
Tenant Name
PEOPLES BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� PUBLIC WORKS DEPARTMENT ~ <br /> Utilities Division,3200 Cedar Street ��,�L� �1���/`1�� <br /> Ev Everett WA 98201 .,,)O ti V . <br /> 425-257-8800 <br /> • I� <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $7365.00 Service Order# <br /> Contact Person Kelli Smith Telephone# 425 259-3161 <br /> Requested By Benyam S Date of Request 8/17/2015 <br /> Property Owner (name) Peoples Bank <br /> Charge Cost to (name if different than owner) Kelli Smith <br /> Address 1716 W Marine View Dr City Everett, WA Zip 98201 <br /> Installation Location 2702 Colby Ave <br /> Installation type/description/size/etc. Connect existing 8" water main to contractor installed 4" D.I. <br /> pipe. Contractor must have 4" DCDA installed in vault w/ purity samples proir to connection. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for schedulin�and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payrnent shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. , <br /> '""=��a� 9� �. <br /> *Must have valid Public Works Permit before wark can be performed. � ���;.,� � ��'�� <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $2664.00 cc: Bldg. Permit Center <br /> Mark Sadler <br /> Labor and Benefits $2636.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $760.00 Paul McKee <br /> Tax $305.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration $1000.00 <br /> TOTAL $7365.00 <br /> Prepared by: '� ' �� "' Date Estimate Prepared �/Z�;/zol,5� <br /> Accepted by: � " � - ; ��� Representing <br /> / <br /> STIMATE GOOD FOR 6 MONTHS <br /> S:A#Common\cicrical\Costest�2015V �� <br /> lofl <br />
The URL can be used to link to this page
Your browser does not support the video tag.