My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 COLBY AVE PEOPLES BANK 2021-04-20
>
Address Records
>
COLBY AVE
>
2702
>
PEOPLES BANK
>
2702 COLBY AVE PEOPLES BANK 2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 3:52:29 PM
Creation date
6/28/2017 9:21:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2702
Tenant Name
PEOPLES BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> PUBLIC WORKS DEPAIZTMENT <br /> Utilities Division,3200 Cedar Sfreet <br /> � Ev �verett WA 98201 <br /> 425-257-8800 <br /> • <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $22588.00 Service Order# <br /> Contac�Person JimGaffney 'I'elephone# 425355-5500 <br /> Requested By Benyam S Date of Request 3/7/2016 <br /> Property Owner(name) Peoples Bank <br /> Charge Cost to (name if different than owner) Jim Gaffney <br /> Address 8105 Broadway City Everett, WA Zip 98203 <br /> Installation Location 2702 Colby Ave <br /> InstaIlation type/description/size/etc. Connect existing 8"water main to contractor installed 4" D.I. <br /> pipe. Contractor must have 4" DCDA installed in vault.City of Everett crew to excavate, shore, <br /> restore and do traffic control. Scope of work is from 8" main to 4" stub-out. Estimate includes <br /> cost of 2" service inside DCDA vault. Please note: Deposit of$11,557.00 has been paid. <br /> ❑ 'The following estimate is based upon the Utilities Division providing alI labor, equipment, <br /> =materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for Iabor,material,equiprnent rental and <br /> adm.inistrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided fnrEher, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> �Deposi.t must be paid prior to ordering parts or scheduling work. <br /> �'Must have valid Public Works Permit before work can be performed. <br /> WATFR METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $5933.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $10547.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $3160.00 Paul McKee <br /> Tax $988.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration $1960.00 <br /> TOTAL $22588.'b0 <br /> Prepared by: � Jim Spo,o. r , Date Estimate Prepared 3-9-2016 <br /> Accepted by: ��`��j�� ~"f'Representing <br /> �� UG ,.: _� <br /> �- �_.E-ST ATE(TOOD FOR 6 MONTIIS <br /> S:A#Common\elerical\Cost.est�2015\ �'� �'.'����''�'��b 9� �i �� �� <br /> ,. � d`� <br /> '����.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.