Laserfiche WebLink
. <br /> PUBLIC WORKS DEPAIZTMENT <br /> Utilities Division,3200 Cedar Sfreet <br /> � Ev �verett WA 98201 <br /> 425-257-8800 <br /> • <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $22588.00 Service Order# <br /> Contac�Person JimGaffney 'I'elephone# 425355-5500 <br /> Requested By Benyam S Date of Request 3/7/2016 <br /> Property Owner(name) Peoples Bank <br /> Charge Cost to (name if different than owner) Jim Gaffney <br /> Address 8105 Broadway City Everett, WA Zip 98203 <br /> Installation Location 2702 Colby Ave <br /> InstaIlation type/description/size/etc. Connect existing 8"water main to contractor installed 4" D.I. <br /> pipe. Contractor must have 4" DCDA installed in vault.City of Everett crew to excavate, shore, <br /> restore and do traffic control. Scope of work is from 8" main to 4" stub-out. Estimate includes <br /> cost of 2" service inside DCDA vault. Please note: Deposit of$11,557.00 has been paid. <br /> ❑ 'The following estimate is based upon the Utilities Division providing alI labor, equipment, <br /> =materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for Iabor,material,equiprnent rental and <br /> adm.inistrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided fnrEher, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> �Deposi.t must be paid prior to ordering parts or scheduling work. <br /> �'Must have valid Public Works Permit before work can be performed. <br /> WATFR METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $5933.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $10547.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $3160.00 Paul McKee <br /> Tax $988.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration $1960.00 <br /> TOTAL $22588.'b0 <br /> Prepared by: � Jim Spo,o. r , Date Estimate Prepared 3-9-2016 <br /> Accepted by: ��`��j�� ~"f'Representing <br /> �� UG ,.: _� <br /> �- �_.E-ST ATE(TOOD FOR 6 MONTIIS <br /> S:A#Common\elerical\Cost.est�2015\ �'� �'.'����''�'��b 9� �i �� �� <br /> ,. � d`� <br /> '����.� <br />