Laserfiche WebLink
� , , Print <br /> Cc: Bd Shanning' <c�I�a�Inili���uhorizc�nn�v.11et>; Vacca, Darrell <br /> <L)arr�(I Vacca'�i:;cc�mcastcom>; Morris, Roe <Roe Moi-risu'�comcast.com> <br /> Subject: FW: 3100.771.14.MDU FTTU.127829(ECLIPSE TOWNHOMES)-NOTIFICATION <br /> assigned to you in Job Tracking. Automatic email. <br /> FYI,just waiting for legal to finish and then we should be good to go. <br /> Thanks <br /> John Warrick <br /> Construction, Planning& Design <br /> O: 425.263-5328 � C: 425.757-1794 <br /> -----Original Message----- <br /> From: Warrick, John <br /> Sent: Monday,April 10, 2017 8:31 AM <br /> To: 11��11`NY.�N��G�I1OIZ[%O\!N���.Ni�:�l� <br /> Cc: Warrick, John<John Warrick��i�cable.coi�lcast.com> <br /> Subject: 3100.771.14.MDU FTTU.127829(ECLIPSE TOWNHOMES)-NOTIFICATION <br /> assigned to you in Job Tracking. Automatic email. <br /> GETTING CLOSE ON BRINGING THE FIBER FROM SIMPSON TO ECLIPSE, HOW ARE WE <br /> LOOKING AS FAR AS SETTING THE V-HUB AND FTC, AND PULLING IN THE FIBER? 2 <br /> BUILDINGS ALMOST COMPLETED, THANKS <br /> This email has been checked for viruses by AVG. <br /> http://www.avg.cc�m <br /> �.,. _... <br /> / � <br /> �� � <br /> https://mg.mail.yahoo.com/neo/launch?.partner=ftr&.rand=dfcrtlsphgt 10 4/19/2017 <br />