Laserfiche WebLink
, <br /> 3 <br /> 3rd AVENUE S .E . SEWER IMPROVEMENT <br /> LID No . 729 <br /> PROJECT DESCRIPTION : <br /> Construction of standard gravity sewer mains , acquisition of <br /> easements , and necessary appurtenances and side sewer <br /> connections as determined by the City Engineer . <br /> The approximate locations of the sewer main constuction are <br /> detailed below: ** <br /> from the existing sewer main in 112th St . S .E . , North to <br /> approximately the center of the cul-de-sac in 3rd P1 . S .E . ; <br /> and <br /> from the Westerly terminus of the existing sewer main in <br /> 112th St . S . E . , North within the 3rd Ave . S . E . right-of-way <br /> approximately 550 feet ; and <br /> from the Westerly terminus of the existing sewer main in <br /> 112th St . S. E . , West approximately 700 feet to the <br /> approximate centerline of 1st Ave . ; and <br /> from the intersection of 1st Ave . S .W. and 1st Dr . S .E . , <br /> South to connect to the proposed sewer main extention in <br /> 112th St . S .E . ; and <br /> from approximately 10 feet North of the South Line of Lot <br /> 35 , Plat of Berg ' s Addition , within the 1st Dr . S . E . <br /> right-of-way, South to connect to the proposed main <br /> extention in 1st Ave . <br /> ** Final design and construction layout will be based upon <br /> plans and specifications approved by the City Engineer <br /> 096 B e / c l o <br /> hiul B <br /> 11 <br />