|
'R�t,s'� a�l -
<br /> V C,1C�e Y ��� c�o�o.� �n
<br /> I
<br /> � �
<br /> �
<br /> PHOTOVOLTAIC NOTES � '�
<br /> 5.60 KW DC PV SYSTEM � �
<br /> SOLAR ROOF PROJECT � �
<br /> 1.AN INVERTER OR AN AC MODULE IN AN INTERACTNE PHOTOVOLTAIC SYSTEM SHALL AUTOMATIC ALL 22.ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN METAL CONDUIT. �:� Q
<br /> DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON 23.THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS SHALL BE IN ACCORDANCE WITH THE � �.+
<br /> LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND "SMACNA"-GUIDLWES FOR SEISMIG RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPING SYSTEMS. J O H N � VALERI E RU SC H "�
<br /> DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED.(NEC 690361) 24.ALL OF THE LISTED SYSTEMS RE�UIRED THAT THE SEISMIC LATERAL FORCE F WCLUDING CONSIDERATION OF ' �
<br /> 2.ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING SHALL BE RAIN TIGHT THREAD-LESS a^P AND r^P BE DETERMWED AT EACH LEVEL OF THE BUILDING SO THAT BRACE SPACING CAN BE CALCULATED.THE 1508 RUCKER AVE �'� �
<br /> COMPRESSION TYPE. DISTRICT STRUCTURAL ENGINEER CAN APPROVE THE SEISMIC LATERAL FORCE DETERMINATION.
<br /> 3.MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED 25.A COPY OF THE CHOSEN BRACING SYSTEM(S)INSTALLATION GUIDE/MANUAL SHALL BE ON THE JOB SITE PRIOR L
<br /> 4.NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER DISTRIBUTION TO STARTING THE INSTALLING OF HANGERS ANDIOR BRACES. EVE RETT, WA 98201 �� �
<br /> SWITCH BOARDS,PANEL BOARDS,DISCONNECTING SWITCHES,TERMINAL CABINETS,ETC.ALL NAMEPLATES SHALL 26.WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING NON-PRESTRESSED
<br /> BE PERMANENTLY ATTACHED AND BE OF SUFRCIENT CFlPACITY TO WITHSTAND THE WEATHER. REINFORCED CONCRETE,USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE REWFORCED BARS. (4Z5) 3Z7-0O30 �� L�
<br /> 5.JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONE�FOR WHEN INSTALLING THEM INTO EXISTING PRE-STRESSED CONCRETE TENDONS BY USING A NON-DESTRUCTIVE �
<br /> APPROPRIATE WATER RUN OFF. METHOD PRIOR TO INSTALLATION.EXERCISE EXTREME CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE (425) 252-8980 �� �
<br /> 6.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFIGENT WEATHERPROOF PULL BOXES OF JUNCTION TENDONS DURING INSTALLATION.MAINTAIN A MINIA4UM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT
<br /> " BOX/COMBINER BOXES PER APPROPRIATE NEC REQUIREMENTS. qND THE DRILLED-IN ANCHOR. �_��
<br /> 7.SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT SPEGFICATIONS 27.THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW ELECTRICAL '
<br /> 8.WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS.FIELD APPLIED EQUIPMENT WILL BE MAINTAWED IN ACCORDANCE WITH NEC 110.26. SCOpe Of WOrk �
<br /> PROTECTIVE COATINGS ARE NOT ACCEPTABLE. 28.CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT.(NEC 300.fi 01,310.8 D) '� ,r�
<br /> 9.JUNCTION,PULL AND OUTLET BOXES LOCATE�BEHIND MODULES SHALL BE SO INSTALLED THAT THE WIRING 29.GROUNDING BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED CONCENTRIC KNOCKOUTS ON THE DC SIDE OF
<br /> ' CONTAWED IN THEM CAN BE RENDERED ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF MODULE(5)SECURED THE SYSTEM.(NEC 250.97) PROPOSED NEW 5.60 KW (DC) ROOF MOUNTED
<br /> BY REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WIRING SYSTEM.(NEC 690.34) 30.THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE IF SMALLER THAN#6 �
<br /> 10.IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM,THE POWER SOURCE SHALL BE LABELED WITH THE FOLLOWWG COPPER WIRE.(NEC 250.64 B) PHOTOVOLTAIC (PV)SYSTEM WITH FOLLOWING
<br /> WARNING AT EACH JUNCTION BOX,COMBINER BOX,DISCONNECT AND DEVICE WHERE THE UNGROUNDED 31.GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXCEPT FOR SPLICES OR JOINTS AT BUSBARS EQU I PM ENT: � �
<br /> CIRCUITS MAY BE EXPOSED DURING SERVICE:"WARNING-ELECTRIC SHOCK HAZARD.THE CURRENT CIRCUIT WITHW LISTED EQUIPMENT.(NEC 250.64 C) (6 z
<br /> CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT MAY BE ENERGIZED WITH THE 32.RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END.(CEC 250.64(E) � w p� Q
<br /> RESPECT TO GROUND DUE TO LEAKAGE PATHS ANDIOR GROUND FAULTS."(NECE 690.35(F)) 33.WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION,A SIGN N �] '
<br /> (20) iTEK ENERGY iT280-HE SOLAR MODULE � W N �
<br /> 11.ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED WILL BE PROVIDED WARNING OF THE HAZARD PER NEC 690.17.34.EACH UNGROUNDED CONDUCTOR OF THE N
<br /> FROM ANY PHYSICAL DAMAGE. MULT-IWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PER PHASE AND SYSTEM PER NEC210.5. � � � U
<br /> 12.ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY. 35.CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH NEC250.97&250.°2(6)&LAMC 93250.97. ��O� BLUE FROG SOLAR YC�JOOA-MIW MICROINVERTER T H � �
<br /> 13.ALL WORK TO COMPLY WITH THE LASTEST EDITION OF CALIFORNIA ELECTRICAL CODE AS AMENDED AND 36.DC CONDUCTORS EITHER DO NOT ENTER THE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES Q
<br /> ADOPTED BY THE CITY OF EASTVALE 201 3 C.E.C. TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER NEC 690.31(E),LAMC 93.690.31(E) � U � �
<br /> 14.ALL WORK TO COMPLY WITH THE 2012 EDITION OF THE CALIFORNIA ELECTRICAL CODE AS AMENDED AND 37.ALL METALLIC FRAME RAILS AND OTHER CURRENT CARRYING METALLIC COMPONENTS(CONDUIT,JUNCTION& � � j, �
<br /> ADOPTED BY THE GTY PULL BOXES,RACEWAY,ETC)SHALL BE SOLIDLY GROUNDED PER THE MANUFACTURER'S INSTALLATION SPIDER-RAX BLACK WIDOW COMPOSITE RACKING SYSTEM w �
<br /> 15.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED. INSTRUCTIONS LAMC 93.690.110.3&93.110.3(B).
<br /> 16.ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER 38.SCREWS,NUTS,BOLTS&WASHERS THAT ATTACH EQUIPMENT GROUNDING LUGS SHALL BE STAINLESS STEEL
<br /> 17.CONTRACTOR SHAIL OBTAW ELECTRICAL PERMITS AND SHALL COORDINATE AL�INSPECTION,COMMISSIONING LAMC 93.110.3(B).
<br /> AND ACCEPTANCE WITH THE CLIENT,UTILITY CO.AND GTY WSPECTORS AS NEEDED 39.NO PIPING.DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED ]
<br /> 18.DRAWINGS ARE DIAGRAMMATIC ONLY,ROUTING OF RACEWAYS SHALL BE AT THE OPTION OF THE WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. CODE AUTHORITY: � a
<br /> CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 40.ALL FIELD INSTALLED JUNCTION,PULL AND OUTLET 80XED LOCATED BEHIND MODULES OR PANELS SHALL BE - d
<br /> 19.IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE CONTRACTOR SHALL NOTIFY ELECTRICAL ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF A MODULE(S)OR PANEL(S)SECURED BY REMOVABLE � �
<br /> ENGINEER TO VALIDATE THE WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. FASTENERS. 2O��J WASHINGTON STATE BUILDING CODE �ZO��J IBC� � � W
<br /> 20.WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT.ARISES ON THE DRAWINGS OR SPECIFICATIONS,THE 41.REMOVAL OF A DWP-INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING F-
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR 2015 WASH I NGTON STATE ENERGY CODE (2015 I ECC) U d' }
<br /> BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS TO ENDURE COMPLETE ourPUT ciRcuiT cRouNOEo corvoucroR. 2015 WASHINGTON STATE RESIDENTIAL CODE(2015 �o Y �
<br /> COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECTIENGINEER. 42.THE ROOF MOUNTED PHOTOVOLTAIC MODULES.PANELS,OR SOLAR VOLTAIC ROLL ROOFING MATERIAL SHALL
<br /> 21.ALL BROCHURES.OPERATION MANUALS,CATALOGS,SHOP DRAWINGS,ETC.SHALL BE HANDED OVER TO THE HAVE THE SAME OR BETTER LISTED FIRE-RESISTANCE RATWG THAN THE BUILDWG ROOF-COVERING MATERIAL. INTERNATIONAL RESIDENTIAL CODE WASHINGTON a O
<br /> OWNER'S REPRESENTATIVE AT THE COMPLETION OR WORK. 43.ALL ROOF MOUNTED CONDUIT WILL BE A MINIMUM 6"OFF THE ROOF SURFACE. �
<br /> AMENDMENTS 2014 WAC51-51-2300 SECTION M2302) �
<br /> 2014 WAC 296-46B (2014 NEC)
<br /> 2015 WASHINGTON STATE MECHANICAL CODE(2015 UMC )
<br /> VICINITY PLAN � 2015 WASHINGTON STATE PLUMBING CODE (2015 UPC) _
<br /> � SCALE:N.T.S 2015 WASHINGTON STATE FIRE CODE (2015 IFC) o � w N
<br /> N �} � � Q � ��
<br /> ; - w � o �
<br /> € � `-d::i�.� 4 c.? .,. ; ' N � w � r� c�
<br /> � s j � W Y N in
<br /> _I U M N
<br /> f � � � Q � �
<br /> I � E �' � '�r.` i � � � � w N N
<br /> ► �4 . ." ' ��s a'r....�_�� (.. : ��- .. ��. . � _ .� ` r �. . 2 ... .t � W .�
<br /> �uJ►, :�* s._ � .�-� .... �. '� � I�' U = `p w a V
<br /> � tk
<br /> � ,(� ' -°`''` i- , „�,� �� 6' - � '�
<br /> r��, '•i nw. � ��-'�"�»zr.� I� ��� ��� ���� �� '- � . � � . �. . � _`t a. .. . O �
<br /> � r� � $ � f ,
<br /> : _� .-' . � � SHEET INDEX . . ., ._ � .
<br /> - � � ��'� � ? �� . ��5�
<br /> � � , ��� , ,, , ,
<br /> �
<br /> � _��.' � �� �� �
<br /> �-.v-_ t'+ ; ,�,� m'�'`r �- � - INDE , UILDING DAT , �
<br /> �
<br /> =� A 1 GENERAL NOTES, SHEET X B A
<br /> '�_��'" ` � �:r �' r� � � �� PROJECT DATA, SITE PLAN o �
<br /> . � ,. �
<br /> �,�_S ;".. -::�_,�` .� ��� ! � � �. ' �� •_� i� A-2 PV LAYOUT PLAN �i -
<br /> .:�, �-��s • .� -• , �, , a�� ��. - =��•' a Q
<br /> , 1 . � ..s ,�Q -� �'�''` 4 , � _ 1� � o A-3 PV ARRAY AND RACKING CONNECTION � X� �
<br /> r�--�-aQ:' � �,� � ' r � ` ��' �' E-1 SINGLE LINE DIAGRAM °� o 0 0 o a
<br /> t �, � _ i� . . A �.�;3P-�� F, ;�-'- E-2 W A R N I N G N O T E S 3 Q � z ~ a
<br /> ;� : .-,w�` ea� �
<br /> `"#� "��.,.-, , �� r-���'�' � 1 • �`` �- E-3 EQUIPMENTS: PV MODULE SPECIFICATION SHEET � w w � � '-
<br /> ' "�r*, � . j.-=�,,, t � ` �`� • � `� � "��� �� E-4 EQUIPMENTS: INVERTER SPECIFICATION SHEET � � � m a �
<br /> � ��'�$ f�, , � ��,� x� � � ���'"'��,,,� S-1 EQUIPMENTS: RACKING SYSTEM
<br /> �' � S-2 EQUIPMENTS: RACKING SYSTEM CERTIFICATE
<br /> i. ��, .:�. ,F� '; ��'��� �� � �,t, �N` � �`
<br /> � T"` �' � • x: . ��' .• � ����- � S-3 EQUIPMENTS: RACKING SYSTEM ATTACHMENT DETAIL �
<br /> fs�'� , � "�.,� , � Y c.< �-
<br /> � '.,�� _�� � ' - T DETAIL �
<br /> � °�
<br /> �!, �`� - �°;-.�`� � ��� S 3.1 EQUIPMENTS: RACKING SYSTEM ATTACHMEN �
<br /> + ' �t .
<br /> - -t��e g� _, �,a�' - �. �:.
<br /> � ��
<br /> � � i �
<br /> �
<br />
|