My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2842A
>
Resolutions
>
Resolution 2842A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 11:38:19 AM
Creation date
7/6/2017 12:01:17 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2842A
Date
3/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br /> A Resolution recommending the construction of only <br /> a portion of the 16th Avenue S.E. improvements suggested <br /> in the 19th Avenue S.E. Area Comprehensive Plan <br /> WHEREAS, the City of Everett adopted the 19th Avenue S.E. Area <br /> Comprehensive Plan by Resolution No. 2347 on November 2, 1983; and <br /> WHEREAS, the 19th Avenue S.E. Comprehensive Plan made specific <br /> recommendations related to transportation improvements; and <br /> WHEREAS, the 19th Avenue S.E. Comprehensive Plan called for <br /> development of an internal street grid including 16th Avenue S.E. ; and <br /> WHEREAS, on January 22, 1985, the Planning Commission discussed the <br /> need to develop a more detailed plan for the alignment of 16th Avenue S.E. <br /> and the east/west connector streets; and <br /> WHEREAS, based on the Planning Commission's concern, the Public Works <br /> and Planning Departments developed a conceptual roadway design. <br /> NOW, THEREFORE, BE IT RESOLVED THAT: <br /> The property owners' proposal to build a portion of the 16th Avenue <br /> S.E. roadway corridor as proposed in L.I.D. 727 is consistent with the 19th <br /> Avenue S.E. Area Comprehensive Plan, and the conceptual roadway design <br /> prepared by the Public Works and Planning Departments with this proposal <br /> completing the critical first phase of the roadway corridor. Additional <br /> east/west streets may also be installed in the alignments depicted in the <br /> conceptual roadway design with the exception that 101st Street S.E. should <br /> not be connected to 16th Avenue S.E. and that Alternative 1 addressing the <br /> 106th Street S.E. location be removed from the Comprehensive Plan and <br /> 106th Street S.E. shall be built in the northern location. <br /> 417d/f-d77 /N7 LO/f / <br /> Date Gretch n Shaffer, Cha rper-9n <br /> City of Everett Planning Commission <br /> APPROVED: Vote 5 - 0 <br /> FOR: Moser, Hoagland, Duffy, Shaffer, Staudt <br /> AGAINST: -0- <br /> ABSENT: Buchea, Utt <br /> I ABSTAIN: -0- <br /> k4/1/1/(ra''' 41/1/11j6// zt/YL--- <br /> nnis L. Derickson, Secretary <br /> Everett Planning Commission <br /> 2482G <br />
The URL can be used to link to this page
Your browser does not support the video tag.