My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3446-15
>
Ordinances
>
Ordinance 3446-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 4:11:38 PM
Creation date
10/13/2015 9:32:35 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3446-15
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 3446-15 <br />AN ORDINANCE creating a special improvement project entitled, <br />"Broadway 10th St. to 19th St. Intersection Safety," Fund 303, <br />Program 104, to accumulate all costs for the improvement. <br />WHEREAS, the City of Everett is committed to a planned pedestrian safety program; and <br />WHEREAS, the City of Everett has identified the need and obtained funds to construct certain <br />pedestrian improvements to federal arterial street segments; and <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br />Section 1: <br />A special improvement project is hereby established as Fund 303, Program 104, entitled <br />"Broadway 10th St. to 19th St. Intersection Safety," to accumulate all costs for the <br />improvement. <br />Section 2: <br />Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br />Program 104, for the improvement project. <br />Section 3: <br />Authorization is hereby granted for the "Public Works Director" or "City Engineer," under <br />direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br />doing all things to accomplish the actions authorized in this ordinance. <br />Section 4: <br />The sum of $608,987 is hereby appropriated to Fund 303, Program 104, "Broadway 10th St. to <br />19th St. Intersection Safety," as follows: <br />A. Estimated Project Costs <br />Design and Construction $ 608,987 <br />Total Estimated Cost 608 987 <br />B. Source of Funds <br />HSIP - Federal Funds $ 531,344 <br />Fund 119 - Street Improvements 77,643 <br />
The URL can be used to link to this page
Your browser does not support the video tag.