Laserfiche WebLink
M ' ` <br /> RESOLUTION NO., g it <br /> A Resolution approving the 1987 improvements <br /> to be done in Lowell with Lowell <br /> Neighborhood funds from the years 1981, <br /> 1982, 1983, 1984, 1985, and 1986 and <br /> setting up the improvements to be completed in 1988. <br /> WHEREAS, Lowell has been allocated funds to be used in Lowell which <br /> have not been used; and <br /> WHEREAS, certain street and sidewalk improvements need to be done to <br /> improve the safety of pedestrians in Lowell; and <br /> WHEREAS, the Lowell Committtee created by the Mayor reviewed and <br /> selected the improvements and unanimously approved them. <br /> NOW, THEREFORE, BE IT RESOLVED BY THE EVERETT CITY COUNCIL OF THE <br /> CITY OF EVERETT THAT: <br /> I. The following improvements will be done in 1987 with the $79,175.22 <br /> of Community Development Block Grant funds left over from prior years <br /> in Lowell accounts; Fund 333, 349, 354, 360, 369, 372, and 381 and <br /> with Overlay funds. <br /> South Third - 41st to 47th (2770 feet west side only) <br /> - Widen to provide paved parking <br /> - To include curb, gutter, sidewalks, and some <br /> landscaping <br /> - Estimated Basic Cost - $150,400 <br /> South Third - 47th to Lowell Road (2884 feet) <br /> - 8-foot maximum width asphalt pedestrian walkway <br /> (west side only) <br /> - To include traffic buttons or rumble bars <br /> - Estimated Basic Cost - $128,800 <br /> In addition to the street and sidewalk improvements, utilities as <br /> required will be done with this project including water lines, <br /> sanitary sewer, and storm sewers. The utilities fund will pay for <br /> the underground utility improvements. <br /> II. The following improvements will be done in 1988 with money allocated <br /> out of the 1988 Community Development Block Grant if available and <br /> Overlay funds. <br /> South Second - 47th to Lenora (3007 feet - west side only) <br /> - Widen to provide paved parking <br /> - Angle parking where feasible and practical <br /> - Estimated Basic Cost - $281,900 <br /> Traffic Signal - Estimated Basic Cost - $ 35,000-$75,000 depending on <br /> location <br />