Laserfiche WebLink
EVERGREEN WAY GATEWAY <br /> LOCAL IMPROVEMENT DISTRICT <br /> RESOLUTION OF INTENTION <br /> EXHIBIT "B" <br /> DESCRIPTION OF IMPROVEMENT: <br /> Evergreen Way from the 4700 Block, South to 52nd Street, with complete <br /> standard arterial improvements to include 2 additional travel lanes, curb, <br /> gutter, sidewalk, and storm drainage modification. <br /> AND <br /> The west half of Evergreen Way from 47th Street North a distance of 210 feet, <br /> with 1/2 complete standard arterial improvements to include one additional <br /> travel lane, curb, gutter, sidewalk, and storm drainage modification. <br /> AND <br /> The East half of Evergreen Way from 52nd, South to the existing improvement <br /> abutting Lot 4, Block 1, Plat of Beverly Hills Division No. 4, and the East <br /> half of Evergreen Way abutting Lots 9 and 10, Block 2, Plat of Beverly Hills <br /> Division No. 4, with 1/2 complete standard arterial improvements to include <br /> one additional travel lane, curb, gutter, sidewalk, and storm drainage <br /> modification. <br /> AND the streets intersecting with Evergreen Way, as follows: <br /> 46th Street, West to the Westerly limit of Business Zoning; <br /> 47th Street, West on the North side to the Westerly limit of R-4 Zoning; <br /> 47th Street, West on the South side to the Westerly limit of B-2 Zoning; <br /> 47th Street, East on the South side to Carlton Road; <br /> Wilmington Avenue, Southeast to 48th Street; <br /> 49th Street, West to the ownership line of the properties fronting Evergreen <br /> Way; <br /> 50th Street, East to the ownership line of the properties fronting Evergreen <br /> Way; <br /> 52nd Street, East to the ownership line of the properties fronting Evergreen <br /> Way; <br /> with standard street improvements to include curb, gutter, sidewalk, and storm <br /> drainage modification. <br /> 0246P <br /> 19 <br /> A it; <br />