Laserfiche WebLink
' PL/BL/C WOR KS <br /> ENGINEERING /PUBLIC SERVICES DEPARTMENT <br /> April 26, 2016 <br /> Dave Tyler <br /> David.d.tyler@boeing.com <br /> RE: Owner: Boeing Company <br /> Job Address: 3003 W Casino RD 45-07 <br /> Plan Check No: B1604-049 <br /> Dear Dave, <br /> In response to your application for a construction permit, your plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and respond to the <br /> comments below. These comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the 2012 <br /> International Building Code (IBC), the 2012 International Fire Code (IFC), the 2012 International <br /> Mechanical Code (IMC), and the 2012 International Energy Conservation (IECC), as amended by the <br /> State of Washington and adopted by the city of Everett. The current IBC referenced standard for <br /> accessible design is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal <br /> ADA, FHA, and HUD regulations and standards, including the Fair Housing Accessibility Guidelines may be <br /> more restrictive. <br /> In order for the processing of your application to continue, it will be necessary to provide the <br /> Building Division with two complete new sets of construction documents reflecting the <br /> corrections requested. <br /> �J�Q • ��"�1. The submitted code compliance sheet(A3) indicates only one exit access stairway from the <br /> �00: service level. IBC 1021.2 requires two. Table 1021.2(2) allows an exit access travel distance of <br /> Ql � 0 only 100 feet for a story to have one exit or exit access. This distance is measured from the most <br /> > o <br /> za remote point of the service level to the exit door on the ground floor. <br /> If you have any questions, please call me at 425-257-7264. <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Steve Miller <br /> Associate Engineer <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425) 257-8200 • Fax (425) 257-8856 <br />