Laserfiche WebLink
As indicated,the proposed soil excavation quantity is approximately 100 cubic yards of soil. Landscaping materials, including trees/shrubs, will be replanted <br /> and/or replaced by CCS per the landscape plan (attached) provided by Steve Ingalsbe with City of Everett Planning.The affected asphalt parking area will be <br /> restored to match current existing conditions at project completion. <br /> Please let me k now if you need any additional information.Thank you, <br /> Michael Q Lam�� <br /> CONESTOGA-ROVERS&ASSOCIATES(CRA) <br /> 20818 44th Avenue West, Suite 190 <br /> Lynnwood, WA 98036 <br /> Office:(425) 563-6508 <br /> Cell: (425)471-1442 <br /> Fax: (425)563-6599 <br /> email:.mg1am@craworld.com <br /> www.CRAworld.com <br /> Think before you printbA. <br /> -tura,, r ry task the safe way,the right way,every time' <br /> ki <br /> You M if <br /> This communication and any accompanying document(s)are confidential and are intended for the sole use of the addressee. If you are not the intended recipient, please notify me at the telephone <br /> number shown above or by return e-mail and delete this e-mail and any copies. You are advised that any disclosure,copying,distribution,or the taking of any action in reliance upon the communication <br /> without consent is strictly prohibited.Thank you. <br /> 3 <br />