Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 11/20/2014 <br /> Public Works Permit#: PW1411-039 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#; <br /> L Everett, WA 98201 <br /> 12 yr Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> DAMARIS SAINZ-MOLLEDO SAME <br /> 4713 HARBOR LN <br /> EVERETT WA 98203 <br /> PHONE: 4257915773 PHONE: <br /> TAX PARCEL ID# SITE ADDRESS: 4713 HARBOR LANE <br /> DESCRIPTION OF PROPOSED WORK: <br /> TRIM TREES <br /> (11/20/2014 10:46 AM BES) <br /> TRIM TREES IN THE RIGHT OF WAY <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Trim trees to the stumps and replace with other vegetations per approved planning recommendations <br /> ..., <br /> 11/20/2014. ,�, rM T'W <br /> 5. Should you need to be on the street for this project use City of Evrett traffic control plan standard#701A: <br /> i.-. <br /> 6. Ccontact City of Evrett Inspector Randy Allen 425-339-7403. prior to starting construction. <br /> rn <br /> i <br /> 0 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs,expenses, or causes of action that may arise <br /> Lbecause of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> to remove same pon notice from the City and to replace <br /> Ap ve for Constru bat public property a aged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signatureo an Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> P U'J <br />