My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2502 HIGHLAND AVE 2017-07-27
>
Address Records
>
HIGHLAND AVE
>
2502
>
2502 HIGHLAND AVE 2017-07-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 2:49:17 PM
Creation date
7/12/2017 2:58:03 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND AVE
Street Number
2502
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11, Supports for solar modules are Instaf led to spread the dead load across as many roof- <br /> framing members as needed to ensure that no point load exceeds fifty(50)pounds, ❑ <br /> [IRC M2302.2,1(5)1 <br /> 12. The photovoltaic modules and supporting structure shall be constructed of <br /> noncombustible materials or fire-retardant treated wood equivalent to that required for' Q <br /> the roof construction. [IRC M2302.2.1] <br /> 13, Roof and wall penetrations shall be flashed and sealed to prevent entry of water, <br /> A EJ <br /> rodents,and insects, [iRC M2302.2.21 <br /> 14. PV modules are listed and labeled with a fire classification In accordance with UL 1.703. on <br /> [iRC M2302.2.3) 9 v <br /> Comments: <br /> 17,74 If you answered yes to all of the above questions,the project qualifies for the over-the- <br /> counter permitting process. <br /> Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,inverters,and combiner boxes are Identified for use In PV systems, El <br /> 2. The inverters are listed and labeled in accordance with UL 1741 and are listed for Ll <br /> utility Interaction. [IRC M2302.41 <br /> t9 Ll <br /> 3. The AC interconnection point is on the load side of service disconnect.[NEC 690.64(B)) <br /> 4. The system meets all current NEC,City and Washington Cities Electrical Code D <br /> requirements. <br /> 5. For split-Buss modules the AC interconnection must be one of the six service Q <br /> disconnects. <br /> 6. Maximum load added to the panelboard is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705.12(1))(2)(3)(b),and is limited to(check combination that <br /> applies): <br /> ❑225 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter OCPD. <br /> ❑225 amp bus/225 amp main OCPD- 8,640 AC watts,maximum 45 amp inverter OCPD. <br /> 1200 amp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp inverter OCPD. <br /> 11150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter OCPD. <br /> ❑125 amp bus/125 amp main OCPD- 4,800 AC watts,maximum 25 amp inverter OCPD. <br /> 0125 amp bus/100 amp main OCPD- 9,600 AC watts,maximum 50 amp Inverter OCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.