My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5209 NARBECK AVE 2017-07-12
>
Address Records
>
NARBECK AVE
>
5209
>
5209 NARBECK AVE 2017-07-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:59:18 PM
Creation date
7/12/2017 3:59:15 PM
Metadata
Fields
Template:
Address Document
Street Name
NARBECK AVE
Street Number
5209
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LPVmodules <br /> ports for solar modules are installed to spread the dead load across as many roof- <br /> ing members as needed to ensure that no point load exceeds fifty(50)pounds. U, ❑ <br /> M2302.2.1(5)1 <br /> photovoltaic modules and supporting structure shall be constructed of <br /> combustible materials or fire-retardant treated wood equivalent to that required for IV ❑ <br /> oof construction. [IRC M2302.2.11 <br /> and wall penetrations shall be flashed and sealed to prevent entry of water, ®r ❑ <br /> nts,and insects.[IRC M2302.2.2] <br /> odules are listed and labeled with a fire classification in accordance with UL 1703, , El <br /> M2302.2.31 <br /> s: <br /> If you answered yes to all of the above questions,the project qualifies for the over-the- <br /> counter permitting process. <br /> Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,inverters,and combiner boxes are identified for use in PV systems. F\Y ❑ <br /> 2. The inverters are listed and labeled in accordance with UL 1741 and are listed for ❑ <br /> utility Interaction.[IRC M2302.41 <br /> 3. The AC interconnection point is on the load side of service disconnect.[NEC 690.64(6)1 <br /> IV EJ <br /> 4. The system meets all current NEC,City and Washington Cities Electrical Code E ❑ <br /> requirements. <br /> BI <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service El 11 <br /> disconnects. <br /> 6. Maximum load added to the panelboard is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705.12(1))(2)(3)(b),and Is limited to(check combination that <br /> applies): <br /> 07.25 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter OCPD. <br /> 0225 amp bus/225 amp main OCPD- 8,640 AC watts,maximum 45 amp inverter OCPD. <br /> N600 amp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp inverter OCPD. <br /> 0150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter CCPD. <br /> ❑125 amp bus/125 amp main CCPD- 4,800 AC watts,maximum 25 amp inverter CCPD. <br /> ❑125 amp bus/100 amp main OCPD- 9,600 AC watts,maximum 50 amp inverter OCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.