Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: <br /> Contractor: �pY�,�,'CI �pIn C I C - <br /> W Owner: <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> d ❑Drywall Nailing ❑ Plumbing Final <br /> V <br /> Final ❑Shear Nailing GAS PIPE <br /> ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ins ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Z —[Gas Pipe <br /> � 5 Final �❑HWT Final <br /> OTHER OR CONSULTATION: SS'C� 3. o. • —1 2y <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER I <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour noticb required <br /> Inspector: Date: ?1-21b A6-21bA6 <br /> EIR(4/09) ONS•42%/488-8900 <br />