Laserfiche WebLink
INSPECTION REPORT <br /> Date: -N Permit: MV_ 1H <br /> (OW77 <br /> Contractor: <br /> Owner: r <br /> Site Address:��? 115 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ice ❑LIFER ground ❑Groundwork/Slab ElGroundwork/Slab <br /> u rk ❑Footing ❑Rough In ❑ Rough In <br /> uit E]Foundation El Ceiling Grid El Ceiling Grid <br /> XRoug I ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> e ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT H SULTATION: <br /> eVA ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> C.0. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector Date: <br /> EIR(4/09) C- Ni]7g$E--OHMS&I R MMOTIONS•425/408-8900 <br />