Laserfiche WebLink
Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> In this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> --------TO 6E COMPLETED BY APPLICANT------- <br /> Project Information <br /> Property Owner Name: JDonette Rotta <br /> Project Address: I I Parcel# 129043600310500 <br /> City: Everett ZIP: 98203 <br /> Day Phone: (206)432-2914 <br /> Contractor Name Smart Energy Today <br /> Contractor License#: SMARTET870BS <br /> Contractor Day Phone: 360 339-6660 <br /> PVsystem description <br /> (include manufacturer 24 itek IT280HE 280 watt panels and 12 Blue Frog YC500A-MIW 620 watt <br /> and model#of PV inverters <br /> modules and <br /> inverters): <br /> oeterrroiiie ii IVOL!.r Project:qUaii&S fior eltPeditesl pei-iilitdilag: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.21 <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by / ❑ <br /> the local jurisdiction. <br /> 3. Rooftop Is made from lightweight material such'as a single layer of composition shingles, El <br /> I roofing,lightweight masonry,or cedar shingles. <br /> 4. The Installation shall comply with the manufacturer's instructions.[IRC M2302.2] ❑ <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to 11 ❑ <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended ,F ❑ <br /> by WA State.[IRC M2302,21 <br /> 7. The PV system is designed for the wind speed rofthe local area,and will be installed per ❑ <br /> the manufacturer's specifications.[IRC M2302.2.1(1)] . <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302.2.1(2)) ijf O <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per-square foot.[iRC M2302.2.1(3)] E3 <br /> Enter total dead load of system(lbs/ftz): 2.6 <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the ❑ <br /> roofing to which they are affixed. [IRC M2302.2.1(4)) <br />