Laserfiche WebLink
12/2/2015 <br /> PUBLIC WORKS PERMIT Date: PW1512- <br /> Public Works Permit#: PW1512-006 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#; <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BNSF RAILROAD CO PETER BOZIN <br /> 2454 OCCIDENTAL AVE S SUITE 2D 11711 SE ST SUITE 120 <br /> SEATTLE WA 98134 BELLEVUE WA 98005 <br /> PHONE: PHONE: 4252855111 <br /> TAX PARCEL ID# SITE ADDRESS: 2910 TERMINAL AVE <br /> REPLACE BROKEN CURB <br /> REMOVE AND INSTALL CURB DAMAGED DURING RAILROAD PROJECT AND INSTALL CURB DROPS FOR <br /> MAINTENANCE ACCESS <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior <br /> to starting construction and with other inspection requests. See attached to request an w <br /> inspection. <br /> 5. Curb shall be replaced per City Standard #305A. (Copy Attached) <br /> 6. Saw cut out in front of proposed gutter and completely remove old curb and gutter. <br /> Consult with public Works Inspector regarding this procedure. O <br /> 7. Provide traffic control per City Standard 701A (copy attached) and per the MUTCD <br /> and per the inspector's directions. Z <br /> 0 <br /> C-+ <br /> Public Works Fee Breakdown: O <br /> Plan Review$20.00 <br /> Inspection $20.00 a <br /> Minor permit$25.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages, costs,expenses,or <br /> �Z �S causes of action that may arise because of installation and maintenance of the <br /> —� improvement or other right-of-way use hereto applied for and further agrees to <br /> Appr ved for Construction Date remove same on notice from the City and to replace public property <br /> damaged ereb <br /> FINAL INSPECTION Date <br /> Approved as Constructed Sign 7-- <br /> I' nt Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE RMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />