Laserfiche WebLink
INSPECTION REPORT <br /> Date: `� Permit:IF <br /> LG�1C�G�Y�L� <br /> Contractor: <br /> lte�Address'. <br /> Owner: 0 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units El Water Service <br /> E]Grounding El insulation mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid [] efrigeration ❑ Rough In <br /> ElRoof drains ❑Building Final as Pipe Final Q ElHWT Final <br /> OT ER OR CONSULTATION: Z-06• 7/ 5 �� U <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE MIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: so Date: IID--7-16 <br /> EIR(4/09) DORMS&PROMOTIONS 425/480-0900 <br />