Laserfiche WebLink
A C, 3 73 (�2 <br /> Electrical lanket permit for 2013 <br /> SVr43 <br /> Everett community college <br /> Steve Lyons Electrical Supervisor <br /> Replace 3 panels-Materials=$2318+labor$700=$3,018 <br /> Single receptacles added about 15,-Breakers, conduit,wire and receptacle plus labor=$200 each, X 15= <br /> $3,000 <br /> Lighting replacements-for fixtures,sensors,switches,conduit and wires plus labor=about$20,000 <br /> Misc electrical=$5,000 <br /> Total=$28,018 <br /> �i <br />