Laserfiche WebLink
INSPECTION REPORT <br /> L� Date: Permit: �l�l ! I <br /> Contractor: �y <br /> F � Owner: CC <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED L <br /> LECTRICAL BUILDING MECHANICAL LUMBING <br /> rvice ❑UFER ground ❑Groundwork/Slab ❑Groundwork/ lab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑ ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> FCeiling Gri ❑Drywall Nailing ❑Plumbing Final <br /> [Crical Fin I ❑Shear Nailing GAS PIPE <br /> SOR ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ng drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTAT <br /> ❑ <br /> APPROVAL AR AL APPROVAL FINAL APPROVAL THIS REZM11 <br /> ❑ OK FOR T.C.O. b RRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ <br /> CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> L <br /> lnspecto . Date: <br /> EIR(4/09) roKms raomonoNs.a!sNas-uyuu <br />