Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 6/20/2014 <br /> City of Everett Public Works Department Public Works Permit#: PW1406-021 <br /> 3200 Cedar Street Parent Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $0 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> HERNANDES LOUIDES A Same <br /> 517 CORNELIA AVE <br /> MUKILTEO, WA, 98275 <br /> PHONE: 4257609724 PHONE: <br /> TAX PARCEL ID#: 00475428400700 SITE ADDRESS: 1409 VIRGINIA AVE <br /> DESCRIPTION: REMOVE ILLEGAL FILL <br /> (6/20/2014 8:23 AM BES) <br /> Remove illegal fill using a bobcat <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Contact City of Everett Inspector Randy Allen 425-339-7403 <br /> prior to starting construction. <br /> City of Everett Offidal Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />