Laserfiche WebLink
INSPECTION REPORT <br /> Date: ` I % Permit: <br /> Contractor: <br /> Owner: f <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑ft <br /> ElGroundwork/Slab <br /> ❑Groundwork ❑Footing 1R, ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑ Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains Building Final El Gas Pipe Final ElHWT Final <br /> OTHER OR ONSULTATION: <br /> ❑ APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> F7 OK <br /> OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4;09) aLSrr n� �F .M,seR aoTioNS•423/488-8vao <br />