Laserfiche WebLink
1 <br /> INSPECTION REPORT <br /> Date JO—Z3-14Pe it:W `l I C)0'2- <br /> Contractor: v2Contractor: <br /> Owner: <br /> Site Address: -- <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHERCRONSULTATION: (2A`N-C+ <br /> ❑ APPROVAL ❑ P IAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. CORRECTION REQUESTED <br /> ❑ F-1F-1OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425))257-8881 FOR REINSPECTION—24 hour notice required <br /> I <br /> .S <br /> n�YLw..S� S.�10 tom-• �a , <br /> 4�c�rZ��- �F <br /> c <br /> 112&nStAJ 9�&QII JSAft2N_-�v o <br /> wo h <br /> Inspector: Date: a" _ <br /> E I R(10/06) DAT BAR.INC. <br />