Laserfiche WebLink
EXHIBIT C-2 <br /> TRANSFER LOT 3 MAXIMUM ACCEPTANCE STANDARDS WORK <br /> Plans stamped 4.06.2017, "Mountain View Business Centre—Division 9 Site Preparation Plans <br /> Exhibit C2" (SP 1-SP9) (David Evans and Associates,Jack N. Molver), approved by Everett City <br /> Engineer on 4.10.17 <br /> Note: In the Amendment, "Transfer Lot 3 Maximum Acceptance Standards Work"and"Transfer <br /> Lot 3 Maximum Work" are the same. <br /> On file with City Engineer, City of Everett <br />