Laserfiche WebLink
plus or minus 1.0 feet(all work in the TL Group Approved Plans, the "TL Group Acceptance <br /> Standards Work"). The City acknowledges it has completed its inspection under Section 1.4 <br /> and has accepted the TL Group Acceptance Standards Work as required under Section 1.8. <br /> (d) Transfer Lot 3 - Acceptance Standards Work. Owner shall complete, <br /> in accordance with the Amended Permit, all work as shown in the approved plan set prepared by <br /> David Evans &Associates in reliance of GeoEngineers recommendations attached as Exhibit C- <br /> 1 (which shall replace and modify the requirements detailed on Exhibit C attached to the <br /> Development Agreement) (the "Transfer Lot 3 Minimum Work Approved Plans"). The <br /> Transfer Lot 3 Minimum Work Approved Plans state the minimum work that will be completed <br /> by Owner (with all work in the Transfer Lot 3 Minimum Work Approved Plans, being the <br /> "Transfer Lot 3 Minimum Acceptance Standards Work"). In addition to the Transfer Lot 3 <br /> Minimum Acceptance Standards Work, Owner shall have the right to raise the rough grade <br /> elevation of Transfer Lot 3 to the elevations shown in the approved plan set prepared by David <br /> Evans &Associates in reliance of GeoEngineers recommendations attached as Exhibit C-2 (to <br /> no greater than 542 feet maximum elevation [NAVD of 1988 Datum], plus or minus 1.0 feet) <br /> (such grade raising, in addition to all other work contained in such Exhibit C-2, the "Transfer <br /> Lot 3 Maximum Work"). Upon completion of the Transfer Lot 3 Minimum Acceptance <br /> Standards Work, Owner may notify City of completion of the Transfer Lot 3 Minimum <br /> Acceptance Standards Work (a"Completion Notice"). Such Completion Notice shall state <br /> whether Owner elects to complete the Transfer Lot 3 Maximum Acceptance Standards Work, or <br /> elects to convey Transfer Lot 3 to the City, as provided in Section 1.4 below. If such <br /> Completion Notice states that Owner elects to complete the Transfer Lot 3 Maximum <br /> Acceptance Standards Work, then Owner shall provide a Completion Notice upon completion of <br /> 7 <br />