My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Traffic Data Gathering 6/28/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Traffic Data Gathering 6/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2017 9:32:30 AM
Creation date
7/25/2017 9:32:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Traffic Data Gathering
Approval Date
6/28/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Corey Hert
Subject / Project Title
Traffic Count Data Collection
Tracking Number
0000776
Total Compensation
$40,200.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hewitt Ave w/o Oakes Ave <br /> Hewitt Ave w/o Rucker Ave <br /> Hewitt Ave w/o Wetmore Ave <br /> Maple St n/o Hewitt Ave <br /> Maple St s/o Hewitt Ave <br /> Merrill Creek Pkwy n/o Seaway Blvd <br /> Pacific Ave e/o Broadway <br /> Pacific Ave e/o Grand Ave <br /> Pacific Ave e/o Maple St <br /> Pacific Ave e/o Walnut St <br /> Pacific Ave w/o Lombard Ave <br /> Pacific Ave w/o Wetmore Ave <br /> Rucker Ave n/o 35th St <br /> Rucker Ave n/o Wall St <br /> Rucker Ave s/o 35th St <br /> Rucker Ave s/o 37th St <br /> SE Everett Mall Way e/o 3rd Ave SE <br /> SE Everett Mall Way ne/o Central Mall Dr <br /> SE Everett Mall Way s/o SR 526 <br /> Seaway Blvd n/o Fluke's Drwy <br /> Seaway Blvd NB n/o SR 526 <br /> Seaway Blvd SB n/o SR 526 <br /> Sievers Duecy Blvd e/o Hardeson Rd <br /> Smith Ave n/o 33rd St <br /> SW Everett Mall Way e/o 4th Ave W <br /> W Casino Rd e/o Airport Rd <br /> W Casino Rd e/o Evergreen Way <br /> W Marine View Dr n/o 25th St <br /> W Mukilteo Blvd w/o Lamar Dr <br /> Task 2:Additional Data Collection <br /> Provide tube count traffic data for additional locations as directed by the City. The task will include the following: <br /> ❑ 7 days (one day is considered a 24 hour period for each day of the week)of traffic data collection using <br /> pneumatic tubes. Data shall be provided in a Timemark VIAS(Vehicle Identification and Analysis System) <br /> program file that can be used to evaluate volume,speed,and classification from the same set of data.Any tube <br /> failures that are repaired does not invalidate existing data,but count information shall be requred for a 24 hour <br /> period for each day of the week. <br /> ❑ Two counters per location will be required each loaction and shall be placed simultaneously to collect data <br /> ine each direction on the same day. Data shall not be collected during federal or State holidays,nor the weekend of a <br /> holiday,nor the week of a holiday. <br /> ❑ The week prior to a planned count being placed, Traffic Data Gathering shall notify by email or other <br /> electronic means of the location to be counted. This information will be passed along by City staff to street <br /> sweeping crews to know to pick up sweeping heads to avoid damaging tubes.Any tube damage by third parties,as <br /> well as damage or theft of counters,is the responsibility of Traffic Data Gathering and no additional compensation <br /> will be given. <br /> Page 14 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.