My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 "Structure excavation Class B", per cubic yard <br /> 2 "Structure excavation Class B Incl. Haul", "per cubic yard. <br /> 3 The unit Contract price per cubic yard for "Structure Excavation Class B _" shall be <br /> 4 full compensation for excavation and stockpiling of the native material to the neat limits <br /> 5 shown in the drawings dewatering. "Structure Excavation Class B Incl. Haul" shall <br /> 6 additionally include full compensation for hauling and disposal. <br /> 7 "Unsuitable Excavation", force account, shall be full compensation for removing, <br /> 8 handling, disposal, and replacement of unsuitable material from below the trench neat <br /> 9 lines as shown in the drawings and directed by the engineer. <br /> 10 "Shoring or Extra Excavation — Unsuitable Excavation", force account, shall be full <br /> 11 compensation for any additional shoring required when "Unsuitable Excavation" is <br /> 12 ordered by the engineer. <br /> 13 <br /> 14 When unsuitable material is found and excavation below the bottom of the trench neat <br /> 15 lines shown on the contract plans is necessary as directed by the Engineer, this <br /> 16 additional excavation to the limits ordered by the Engineer shall be paid for under <br /> 17 "Unsuitable Excavation". Extra excavation beyond the vertical neat lines shall be <br /> 18 included in the cost for"Structure Excavation Class B" or "Structure Excavation Class B <br /> 19 Including Haul". Shoring costs for trench excavation shall be paid for under"Shoring or <br /> 20 Extra Excavation Class B", as specified in Section 2-09. <br /> 21 Force accounts as provided in Section 1 are intended to provide a common Proposal for <br /> 22 all Bidders; the Contracting Agency has entered an amount in the Proposal to become a <br /> 23 part of the Contractor's total Bid. <br /> 24 <br /> 25 Cost per ton of import material includes compaction of that material in place. <br /> 26 All costs in jointing dissimilar pipe with a coupling or concrete collar shall be included in <br /> 27 the unit contract price per foot for the size and type of pipe being jointed. <br /> 28 <br /> 29 WATER MAINS <br /> 30 Description <br /> 31 Section 7-09.1 is deleted and replaced with the following: <br /> 32 <br /> 33 (City of Everett GSP) <br /> 34 Pipe and fittings for water mains shall be in accordance with Section 7-09 of the <br /> 35 Standard Specifications, except as hereinafter amended. <br /> 36 <br /> 37 Materials <br /> 38 The following portions of Section 7-09.2 are revised as follows: <br /> 39 <br /> 40 (******) <br /> 41 Materials shall meet the requirements of the following sections of these Special <br /> 42 Provisions: <br /> 43 <br /> 44 Pipe <br /> 45 Ductile Iron Pipe 9-30.1(1) Special Provisions <br /> 46 <br /> 47 Fittings <br /> 48 Restrained Joints 9-30.2(6) Special Provisions <br /> 49 <br /> 50 Hydrants 9-30.5 Special Provisions <br /> 51 <br /> 52 Service Connections (2 inches and smaller) 9-30.6 Special Provisions <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE June 2,2017 <br /> WO#3588 S209 <br /> age 5 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.