My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 13 <br /> In Section 9-05.32, Flexible Coupling (New Section), of the Specifications there is a table <br /> showing nominal flexible coupling size and minimum expansion per size. In the table under the <br /> minimum expansion requirement are these values at minimum expansion or minimum total <br /> movement?If at minimum expansion, do you want contraction capability? If no contraction <br /> capability necessary, is it acceptable for these units to ship fully compressed allowing only for <br /> expansion? <br /> Answer—The minimum expansion noted in the table in Section 9-05.32 refers to the total <br /> movement of the coupling. Couplings should be installed according to section 7-04.3, which <br /> describes what position the fittings should be installed at according to the ambient temperature <br /> at the time of installation as well as the location (above or below grade). <br /> Question 14 <br /> For the single ball flexible coupling (FL) on Sheet No. 14 (Drawing C4.1), is a ball joint with no <br /> expansion capability to be placed there? <br /> Answer—Correct. <br /> Question 15 <br /> Is the DOT Form 422-103 EF to be turned in with the bid documents? <br /> Answer— No, 422-103 EF is only used to report on DBE participation during the construction <br /> phase. The DBE Utilization Certification (DOT Form 272-056) and the DBE Written Confirmation <br /> (DOT Form 422-031) are required. <br /> Question 16 <br /> What is the size of the Overflow Roof Drain Pipe on Sheet No. 61 (Drawing A6.2) and which Bid <br /> Item is this to be paid under? <br /> Answer—The Overflow Roof Drain Pipe size is 4" DI, shown on S9.03, to be paid for under Bid <br /> Item No. A179, "Roofing System". <br /> Question 17 <br /> What is the roof framing and roof deck pan on Sheet No. 85 (Drawing S1.18) to be paid under? <br /> Answer—The roof framing is to be paid for under Bid Item No. A95, "Structural Low Alloy <br /> Steel — Utility Bridge".The 3" Galvanized Metal Roof Deck is to be paid for under Bid Item No. <br /> A179, "Roofing System". Page S175, Section 6-24.5 is revised to clarify the roof system. <br /> Question 18 <br /> Does engineering account for the loads or is the design for camber to off-set sag the <br /> responsibility of the contractor? <br /> Answer—The final in-place erection of the bridge with all dead and live loads shall have no <br /> (zero) sag. The contractor is responsible to account for camber requirements based on their <br /> erection method and sequence of construction of the bridge and application of loads. <br /> Question 19 <br /> Is there an update to the .dxf/.dwg files for the aluminum throw barrier panels? <br /> Answer—Yes. The updated files, per the revisions to Sheet No. 57 (Drawing A5.1), can be <br /> obtained at the following location (same location as mentioned in Addendum No. 4): <br /> Site = http://extranet.seattle.kpff.com <br /> Username = bidder <br /> Password = @ddendum4 <br /> City of Everett Addendum No. 8 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 5 <br /> _age 5 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com -Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.