Question 13 <br /> In Section 9-05.32, Flexible Coupling (New Section), of the Specifications there is a table <br /> showing nominal flexible coupling size and minimum expansion per size. In the table under the <br /> minimum expansion requirement are these values at minimum expansion or minimum total <br /> movement?If at minimum expansion, do you want contraction capability? If no contraction <br /> capability necessary, is it acceptable for these units to ship fully compressed allowing only for <br /> expansion? <br /> Answer—The minimum expansion noted in the table in Section 9-05.32 refers to the total <br /> movement of the coupling. Couplings should be installed according to section 7-04.3, which <br /> describes what position the fittings should be installed at according to the ambient temperature <br /> at the time of installation as well as the location (above or below grade). <br /> Question 14 <br /> For the single ball flexible coupling (FL) on Sheet No. 14 (Drawing C4.1), is a ball joint with no <br /> expansion capability to be placed there? <br /> Answer—Correct. <br /> Question 15 <br /> Is the DOT Form 422-103 EF to be turned in with the bid documents? <br /> Answer— No, 422-103 EF is only used to report on DBE participation during the construction <br /> phase. The DBE Utilization Certification (DOT Form 272-056) and the DBE Written Confirmation <br /> (DOT Form 422-031) are required. <br /> Question 16 <br /> What is the size of the Overflow Roof Drain Pipe on Sheet No. 61 (Drawing A6.2) and which Bid <br /> Item is this to be paid under? <br /> Answer—The Overflow Roof Drain Pipe size is 4" DI, shown on S9.03, to be paid for under Bid <br /> Item No. A179, "Roofing System". <br /> Question 17 <br /> What is the roof framing and roof deck pan on Sheet No. 85 (Drawing S1.18) to be paid under? <br /> Answer—The roof framing is to be paid for under Bid Item No. A95, "Structural Low Alloy <br /> Steel — Utility Bridge".The 3" Galvanized Metal Roof Deck is to be paid for under Bid Item No. <br /> A179, "Roofing System". Page S175, Section 6-24.5 is revised to clarify the roof system. <br /> Question 18 <br /> Does engineering account for the loads or is the design for camber to off-set sag the <br /> responsibility of the contractor? <br /> Answer—The final in-place erection of the bridge with all dead and live loads shall have no <br /> (zero) sag. The contractor is responsible to account for camber requirements based on their <br /> erection method and sequence of construction of the bridge and application of loads. <br /> Question 19 <br /> Is there an update to the .dxf/.dwg files for the aluminum throw barrier panels? <br /> Answer—Yes. The updated files, per the revisions to Sheet No. 57 (Drawing A5.1), can be <br /> obtained at the following location (same location as mentioned in Addendum No. 4): <br /> Site = http://extranet.seattle.kpff.com <br /> Username = bidder <br /> Password = @ddendum4 <br /> City of Everett Addendum No. 8 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 5 <br /> _age 5 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com -Always Verify Scale <br />