1 piling designed for a Cooper E-80 loading according to the American Railway <br /> 2 Engineering and Maintenance Association (AREMA) Manual For Railway <br /> 3 Engineering. Damage to the railroad track or railroad facilities, due to the <br /> 4 Contractor's operations, will be repaired by the Railroad at the Contractor's <br /> 5 expense. <br /> 6 <br /> 7 (******) <br /> 8 Based on the soil and ground water conditions at the western bridge abutment, <br /> 9 the Contractor shall anticipate the following: <br /> 10 <br /> 11 1. The proposed excavation will extend below the ground water table at this <br /> 12 location. Therefore, a watertight cofferdam and a dewatering system is <br /> 13 required. <br /> 14 <br /> 15 2. Obstructions could be encountered during installation of the temporary <br /> 16 shoring/cofferdam. Obstructions are anticipated to vary from buried logs to <br /> 17 large boulders. Pre-drilling or digging to facilitate driving of sheet piles or <br /> 18 other shoring/cofferdam elements may be necessary. <br /> 19 <br /> 20 No separate payment will be made for removal of obstructions, as necessary <br /> 21 to install the shoring/cofferdam and excavate for the western bridge abutment <br /> 22 concrete shaft cap and seal. <br /> 23 <br /> 24 Very dense glacially consolidated outwash soils are present below the historic <br /> 25 fill and Bay deposits in the vicinity of the western bridge abutment. Pre-drilling <br /> 26 or impact driving may be required to facilitate driving of sheet piles or other <br /> 27 shoring/cofferdam elements within the very dense glacially consolidated <br /> 28 outwash soils. No separate payment will be made for the time, materials and <br /> 29 equipment required to advance the sheet piles or other shoring/cofferdam <br /> 30 elements into the very dense glacially consolidated outwash soils, as <br /> 31 necessary to install the shoring/cofferdam shoring. <br /> 32 <br /> 33 Driving sheet piles or other shoring/cofferdam elements into the very dense <br /> 34 glacially consolidated outwash soils could result in the contractor not being <br /> 35 able to remove the sheet piles or other shoring/cofferdam elements after <br /> 36 construction. No separate payment will be made to compensate the contractor <br /> 37 for the cost of sheet piles or other shoring/cofferdam elements that cannot be <br /> 38 removed and need to be abandoned in place. <br /> 39 <br /> 40 Measurement <br /> 41 <br /> 42 The third paragraph of Section 2-09.4 is replaced with the following: <br /> 43 <br /> 44 (******) <br /> 45 For all pipes, pipe arches, structural plate pipes, and underpasses, the Structure <br /> 46 excavation quantity will be calculated based on the dimensions called out in the plans. <br /> 47 <br /> 48 The subsection Lower Limits of Section 2-09.4 is supplemented with the following: <br /> 49 <br /> 50 (January 4, 2010 WSDOT GSP) <br /> 51 Under girders, at end pier embankments, the lower limit will follow a line parallel to the <br /> 52 bottom of the girders and three feet below them. <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE May 18,2017 <br /> WO#3588 S118 <br /> age 7 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />