My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section II. Definitions <br /> A. BODILY INJURY means physical injury, sickness or disease, sustained by any person, including death <br /> resulting therefrom or mental anguish, emotional distress or shock, sustained by any person. <br /> B. CLAIM means a monetary demand or notice, or assertion of a legal right alleging liability or responsibility <br /> on the part of any INSURED and includes a lawsuit, petition, or governmental or regulatory action <br /> commenced against any INSURED. <br /> CLAIM does not include any of the foregoing arising out of an act, error or omission in PROFESSIONAL <br /> SERVICES or a POLLUTION CONDITION reported under a prior policy issued by the Company or any <br /> entity affiliated with the Company. <br /> C. CLIENT means the person or organization that directly hires the NAMED INSURED, by written contract <br /> signed by the NAMED INSURED, to render CONTRACTING SERVICES and for whom the NAMED <br /> INSURED renders such services. <br /> D. CONTRACTING SERVICES means those activities listed in Item (6) of the Declarations that are rendered <br /> by or on behalf of the NAMED INSURED. <br /> E. COMPLETED OPERATIONS means CONTRACTING SERVICES that are completed. <br /> COMPLETED OPERATIONS does not include CONTRACTING SERVICES that have been abandoned. <br /> CONTRACTING SERVICES will be deemed completed at the earliest of the following times: <br /> 1. when all CONTRACTING SERVICES to be performed under the contract have been completed; or <br /> 2. when all CONTRACTING SERVICES to be performed at the JOB SITE have been completed; or <br /> 3. when that portion of the CONTRACTING SERVICES have been put to its intended use by any <br /> person or organization other than another contractor or subcontractor working on the same project. <br /> CONTRACTING SERVICES that may require further service, maintenance, correction, repair or <br /> replacement, but are otherwise complete, shall be deemed completed. <br /> F. EMERGENCY REMEDIATION EXPENSE means reasonable and necessary REMEDIATION EXPENSE <br /> incurred on an emergency basis at a JOB SITE to address a POLLUTION CONDITION resulting from the <br /> rendering or failure to render CONTRACTING SERVICES, which the Company deems reasonable and <br /> necessary to mitigate the immediate effects of the POLLUTION CONDITION. <br /> G. ENVIRONMENTAL DAMAGE means physical damage in or upon land, the atmosphere, watercourse, <br /> body of water or groundwater, caused by a POLLUTION CONDITION and resulting in REMEDIATION <br /> EXPENSE. <br /> ENVIRONMENTAL DAMAGE does not include PROPERTY DAMAGE. <br /> H. EXTENDED REPORTING PERIOD means the Automatic Extended Reporting Period or, where applicable, <br /> the Optional Extended Reporting Period, as set forth in Section V. Extended Reporting Period. <br /> INSURED means each of the following: <br /> 1. Any NAMED INSURED, and any current or former director, partner, member, executive officer, <br /> employee or LEASED WORKER of the NAMED INSURED, but solely while acting within the <br /> course and scope of his/her duties as such. <br /> PCPocCP 0713 ©2013 X.L. America, Inc. All Rights Reserved. Page 4 of 23 <br /> May not be copied without permission. <br /> RECZ 06/09/2014 <br /> 8 of 14 INTECONS(TSE00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.