Laserfiche WebLink
1 Walkway Pads: Install walkway products in locations indicated. Adhere walkway <br /> 2 products to substrate with compatible adhesive according to roofing system <br /> 3 manufacturer's written instructions <br /> 4 <br /> 5 6-24.3 (5) Protection <br /> 6 Protect roofing systems from vandalism and damage that might be incurred by <br /> 7 construction traffic, equipment, property, and persons. <br /> 8 <br /> 9 6-24.3 (6) Clean-Up <br /> 10 All work areas shall be kept clean during progress of work and until completion. Dispose <br /> 11 of all surplus, waste materials, and rubbish according to laws, regulations, and <br /> 12 ordinances. Provide certification from disposal site operator stating that disposal site <br /> 13 complies with all governmental regulations. <br /> 14 <br /> 15 6-24.4 Measurement <br /> 16 Bid items of work completed pursuant to the contract will be measured as provided in <br /> 17 Section 1-09.1 Measurement of Quantities, unless otherwise provided for by individual <br /> 18 measurement paragraphs herein this Section. <br /> 19 <br /> 20 Measurement for"Roofing System"will be per square foot. <br /> 21 <br /> 22 Measurement for'Walkway Pads"will be per square foot <br /> 23 <br /> 24 6-24.5 Payment <br /> 25 Compensation for the cost necessary to complete the work described in this Section will be <br /> 26 made at the Bid item prices Bid only for the Bid items listed or referenced as follows: <br /> 27 <br /> 28 "Roofing System" per square foot. <br /> 29 "Walkway Pads" per square foot. <br /> 30 The unit Contract price for Roofing system shall be full pay for all materials including 3" <br /> 31 galvanized metal roof deck , labor, tools, equipment and supplies necessary to furnish, and <br /> 32 install the above as specified or shown on the Plans. <br /> 33 <br /> 34 (******) <br /> 35 ROOFING ACCESSORIES (NEW SECTION) <br /> 36 6-25.1 Description <br /> 37 This work consists of providing and installing of roof accessories. Work includes all <br /> 38 fasteners, equipment and related material needed to facilitate installation in accordance with <br /> 39 these Specifications and as shown on Plans or directed by the Engineer. <br /> 40 <br /> 41 6-25.1 Materials <br /> 42 Materials shall meet the requirements of the following sections <br /> 43 <br /> 44 Insulated Roof Hatch <br /> 45 Type and size: Single leaf lid 2'-6" X by 3'-0". as indicated on drawings. Roof hatch <br /> 46 shall meet the following minimum requirements: <br /> 47 <br /> 48 Frame: 14 gage galvanized steel, welded to a height of approximately 12 inches, but not <br /> 49 less than 8 inches above finished roofing assembly, complete with minimum 3-1/2 <br /> 50 inches mounting flanges and same gage counterflashing. Curb: 1 inch thick rigid <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE May 18,2017 <br /> WO#3588 S175 <br /> ige 15 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />