Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The Contractor shall provide laser control equipment as approved by the <br /> 2 Engineer for setting pipe grades. <br /> 3 <br /> 4 7-08.3(2)H Sewer Line Connections <br /> 5 Section 7-08.3(2)H is supplemented with the following: <br /> 6 <br /> 7 (City of Everett GSP) <br /> 8 When replacing an existing sewer line, storm drain lines which are connected <br /> 9 to the existing sewer system, unless otherwise specified, shall be reconnected <br /> 10 to the new sewer in accordance with the Standard Specifications. <br /> 11 <br /> 12 The minimum size of new storm drain line shall be 8". Vertical connections of <br /> 13 drain lines to sewer main between manholes shall not be allowed without prior <br /> 14 approval by the Engineer. <br /> 15 <br /> 16 Reconnection of drain lines shall be considered as incidental to the <br /> 17 construction and all costs thereof shall be included in various unit contract <br /> 18 prices on the proposal. <br /> 19 <br /> 20 Backfilling <br /> 21 Section 7-08.3(3) is supplemented with the following: <br /> 22 <br /> 23 <br /> 24 Backfilling shall be performed only after inspection and approval of the installed <br /> 25 pipe. Refer to City Standard Drawings 610 and 615 for typical trench section <br /> 26 backfill and compaction requirements. <br /> 27 <br /> 28 If native material is not suitable for use as backfill, "Gravel Borrow" conforming to <br /> 29 Section 9-03.14(1) of these Special Provisions shall be used, as required by the <br /> 30 Engineer, for trench backfill. Where trench sections are defined in the drawings, <br /> 31 the materials called for shall be used. Gravel borrow shall not be used in lieu of the <br /> 32 materials specified in the drawings unless specifically approved by the Engineer. <br /> 33 <br /> 34 If the native material is unsuitable at the foundation level, as determined by the <br /> 35 Engineer, excavation shall continue to the depth required by the Engineer. The <br /> 36 unsuitable foundation material shall be replaced with "Quarry Rock", as described <br /> 37 in section 9-13.8 of these special provisions, compacted firmly into the subgrade <br /> 38 soils. After placement of "Quarry Rock", the upper surface shall be compacted to <br /> 39 minimize exposed jagged edges across the over excavated area. A construction <br /> 40 geotextile meeting the specification requirements for separation as provided in <br /> 41 table 3 of Section 9-33.2(1) Standard Specifications shall be placed over the top of <br /> 42 all "Quarry Rock" prior to placement of pipe bedding. The unsuitable material shall <br /> 43 be disposed of by hauling to a waste site obtained and provided by the Contractor <br /> 44 in accordance with Section 2-03.3(7)C of the Standard Specifications. Stockpiling <br /> 45 of unsuitable material on the project site will not be allowed. <br /> 46 <br /> 47 If there is an excess of backfill material obtained from trench excavation at one <br /> 48 location on the project, it shall be used at other locations on the project or disposed <br /> 49 of as at an approved disposal site. The cost of transporting the excess backfill <br /> 50 material shall be considered incidental to the project. <br /> 51 <br /> 52 Extra excavation in lieu of constructing shoring is not permitted. <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE June 2,2017 <br /> WO#3588 S207 <br /> _ige 3 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />