My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3009 GEDNEY ST 2017-08-01
>
Address Records
>
GEDNEY ST
>
3009
>
3009 GEDNEY ST 2017-08-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2017 7:53:05 AM
Creation date
8/1/2017 7:52:55 AM
Metadata
Fields
Template:
Address Document
Street Name
GEDNEY ST
Street Number
3009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i �; � <br /> , ESR-1413 � Most Widely Accepted and Trusted Page 2 of 2 <br /> [0.090 inch (2.3 mm)] of wet-film thickness is required that 5.0 CONDITIONS OF USE <br /> will extend up the walls to 6 inches (152 mm) on either The RedGard° Waterproofing and Crack Prevention <br /> side. As an option, a 6-inch-wide (152 mm) section of Membrane, C-Cure Pro-Red Waterproofing Membrane <br /> fiberglass mesh, as described in Section 3.2.2., may be g63, CBP 232 Waterproofing and Anti-Fracture Membrane <br /> embedded into the membrane at corners or where floors and Jamo Waterproofing Membrane described in this <br /> and walls meet. In lieu of the roller or trowel, an airless report comply with, or are suitable alternatives to what is <br /> sprayer may be used. The sprayer must be operated specified in, those codes listed in Section 1.0 of this report, <br /> between 1900 and 2300 psi (13.10 and 15.33 MPa) to subject to the following conditions: <br /> produce a flow rate of 1.0 to 1.5 gallons (3.78 to 5.68 liter) 5.1 Application must comply with this report, the <br /> per minute; the sprayer must have a tip orifice size of manufacturer's published installation instructions and <br /> 0.025 to 0.029 inch (0.63 to 0.73 mm). A continuous flm the applicable code. In the event of a conflict between <br /> with overlapping spray must be applied. No seams are the installation instructions and this report, this report <br /> permitted. The membrane appears pink when wet and dark governs. <br /> red when dry. After the first coat has turned red, with no <br /> blushing or light pink showing (approximately 1'/2 to 5.2 Application is limited to ceramic tile and dimension <br /> 2 hours), the film must be visually inspected for integrity, stone installations on floors and for use as shower <br /> and all voids or pinholes must be filled with additional sub-pans or linings. <br /> material. A second coat must be applied at right angles to 5.3 The membrane must not be used to bridge substrate <br /> the frst. The flm thickness must also be checked expansionjoints. <br /> periodically with a wet-flm gauge. The combined frst and <br /> second coatings must be a minimum of 50 mils 0.050 inch 5.4 The membrane recognized in this report is <br /> (1.27 mm)] thick when wet and 25 mils [0.025 inch manufactured by Custom Building Products in Grand <br /> (0.64 mm)] thick when dry. A minimum of sixty minutes of Prairie, Texas under a quality control program with <br /> curing time is required after application. annual inspection by ICC-ES. <br /> 4.3 Application over Expansion Joints: 6.0 EVIDENCE SUBMITTED <br /> The membrane must not be used to bridge expansion Data in accordance with the ICC-ES Acceptance Criteria <br /> joints. When applied over expansion joints, the joint must for Waterproof Membranes for Flooring and Shower Lining <br /> be cleaned, and an opened or closed-cell backer rod is (AC115), dated June 2003 (editorially revised August <br /> installed to proper depth as specified by the designer. A 2013) and American National Standard Specification for <br /> sealant must be compressed into the joint, coating the Load Bearing, Bonded, Waterproof Membranes for Thin- <br /> sides and leaving the joint flush with the surface. After the Set Ceramic Tile and Dimension Stone Installation <br /> sealant is dry, bond breaker tape specifed by the (A118.10), dated 2014. <br /> manufacturer must be placed over the joint. Two coats of <br /> mernbrane inust be applied at a minimum of 25 mils [0.025 7•0 IDENTIFICATION <br /> inch (0.64 mm)] wet-film thickness per coat over the joint Containers of the RedGard" Waterproofing and Crack <br /> and substrate following the instructions in Section 4.2 of Prevention Membrane, C-Cure Pro-Red Waterproofing <br /> this report. The tiles or stones are then applied over the Membrane 963, CBP 232 Waterproofing and Anti-Fracture <br /> membrane, leaving a gap over the joint as specified by the Membrane and Jamo Waterproofing Membrane described <br /> designer. After the work is set, the joint must be flled as in this report are identified by a label bearing the <br /> specified by the designer. manufacturer's name (Custom Building Products) and <br /> 4.4 Method of Repair: address, the product name, the date of manufacture and <br /> the evaluation report number(ESR-1413). <br /> The membrane in the area requiring repair must be <br /> removed and the area cleaned, allowing for a minimum <br /> 2-inch (51 mm) overlap. Two coats of inembrane must be <br /> applied as described in Section 4.2 of this report. <br /> �./ ��U � <br />
The URL can be used to link to this page
Your browser does not support the video tag.