My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10910 HOLLY DR 2017-08-01
>
Address Records
>
HOLLY DR
>
10910
>
10910 HOLLY DR 2017-08-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2017 8:23:50 AM
Creation date
8/1/2017 8:16:16 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10910
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Fire Suppression(Sprinkler) System -An approved automatic suppression system shall be provided <br /> as required by City Ordinance No. 3021-07, Chapter 16.76, of the Everett Municipal Code. The <br /> system must include a mechanical water gong bell. <br /> Plans for any such system shall be submitted to the Engineering &Public Services Department for <br /> examination and approval. Such plans shall include plans for the underground mains that will supply <br /> the sprinkler system. <br /> The type of sprinkler to be installed will be determined by the Building Official. It may be an NFPA <br /> 13,NFPA 13R, or NFPA 13D system depending upon several factors. Sprinkler installation shall <br /> not begin without an approved and stamped set of plans from the Engineering& Public <br /> Services Department. The Fire Department will also review the plans and shall field inspect the <br /> installation based only on approved plans that must be on site. Changes to plans must be approved by <br /> both the Engineering &Public Services and Fire Departments. <br /> Aboveground sprinkler piping shall be hydrostatically tested as established in NFPA Standazd 13. <br /> Underground piping shall be hydrostatically tested and flushed as established in NFPA Standard 24 <br /> for private fire mains. (Below-�round pipin�must be installed by Washin�ton State Patrol <br /> Licensed Underground Sprinkler line certified "U" installers. For further information, contact <br /> the State Fire Marshal's Of�ce at(360) 570-3134 or contact the Everett Fire Department at <br /> (425) 257-8123.) All such tests shall be witnessed by a Fire Department Inspector. Call (425)257- <br /> 8124 to make an appointment for inspection. <br /> Contractors'materials and test certificates shall be subznitted to the Everett Fire Department prior to <br /> issuance of any Certificates of Occupancy. <br /> Call (425)257-8123 for more information. <br /> 11. Trash Collection- Dumpsters over 1.5 cubic yards capacity shall be located a minimum of 5 feet <br /> from the building [IFC 304.3.3, 2006 Edition]. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in this area. To initiate new service orders,please <br /> contact Marilyn Davis Westlund at(425)356-7512 at least 90 days prior to the required in-service <br /> date. <br /> Any relocation of existing gas facilities for this development will be at the developer's sole expense, <br /> and requires 90 days minimum notice. Please contact Elaine Babby at(206)224-2018 to coordinate <br /> relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br /> However,the existing District facilities in the local area may require upgrading. Cost of any work, <br /> new or upgrade,to existing facilities that is required to connect this proposed development to the <br /> District electric system shall be in accordance with the applicable District policy. The development <br /> will be required to supply the District with suitable locations/easements upon their property for any <br /> 11 J ,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.