Laserfiche WebLink
Southpoint Sewers - 718 of Consolidated Proposal <br /> CITY OF EVERETT, WASHINGTON <br /> RESOLUTION NO. 3J <br /> A RESOLUTION of the City Council of the City of Everett, Washington, <br /> declaring its intention to order the improvement of 1st Place West, also <br /> known as Howard Ave., from 200 feet south of Everett Mall Way, to <br /> 104th Street, and Meridian Ave., also known as Warren Ave., from 200 <br /> feet south of Everett Mall Way, to 104th Street, and 1st Drive SE, also <br /> known as Ward Ave., from 200 feet south of Everett Mall Way, to 104th <br /> Street, and 104th Street, from 1st Place West, also known as Howard <br /> Ave., to 3rd Ave. SE, and 9th Drive W, also known as Olivia Park Road, <br /> from 100 feet, south of 100th St. SW to Everett Mall Way, with an 8 inch <br /> sanitary sewer system, and property acquisition; and necessary <br /> appurtenances as determined by the City Engineer in connection <br /> therewith and to create a local improvement district to assess the cost <br /> and expense of carrying out such improvement against the properties <br /> specially benefitted thereby, and notifying all persons who desire to <br /> object to the improvements to appear and present their objections at a <br /> meeting of the City Council to be held on February 20, 1985, at 7:00 p.m. <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EVERETT, <br /> WASHINGTON, as follows: <br /> Section 1: RCW 35.43.040 provides that the legislative authority of a City <br /> may order a local improvement district. <br /> Section 2: It is the intention of the City Council of the City of Everett, <br /> Washington, based on RCW 35.43.040, to order the improvement of the following <br /> property: <br /> See Exhibit "A" which is attached hereto and incorporated by <br /> reference herein. <br /> by the construction and installation of: <br /> 1st Place West, also known as Howard Ave., from 200 feet south of Everett <br /> Mall Way, to 104th Street, and <br /> Meridian Ave., also known as Warren Ave., from 200 feet south of Everett <br /> Mall Way, to 104th Street, and <br /> 1st Drive SE, also known as Ward Ave., from 200 feet south of Everett Mall <br /> Way, to 104th Street, and <br /> 104th Street, from 1st Place West, also known as Howard Ave., to 3rd Ave. <br /> SE, and <br /> 9th Drive W, also known as Olivia Park Road, from 100 feet south of 100th St. <br /> S.W. to Everett Mall Way. <br /> with an 8 inch sanitary sewer system and property acquisition, and necessary <br /> appurtenances as determined by the City Engineer in connection therewith. <br /> Section 3: The total estimated cost and expense of the improvement is <br /> declared to be $737,800 and the entire cost and expense of such improvement shall <br /> be borne by, and assessed against, the property specially benefitted by such <br /> improvement to be included in a local improvement district to be established <br /> embracing as near as may be all property specially benefitted by such <br /> improvement. <br />