Laserfiche WebLink
r. <br /> (Exhibit "B" Cont'd) <br /> Amended <br /> Original <br /> Assessment <br /> Description Amount <br /> Parcel #3 (Briar Development - Haggen Site) $112,131.74 <br /> A portion of the Southeast quarter of Section 18, //� i57 3 7 <br /> Township 28 North, Range 5 East, W.M., in Snohomish <br /> County, Washington, described as follows: <br /> Commencing at the Northeast corner of the Northwest <br /> quarter of the said Southeast quarter, said point bearing <br /> N89°45'53" East a distance of 1341.02 feet from the <br /> Northwest corner of said Southeast quarter; thence <br /> South 89 45'53" West along said subdivision line a <br /> distance of 547.76 feet; thence South 02 15'00" East a <br /> distance of 546.96 feet; thence North 870 <br /> 45'00" East a <br /> distance of 344.05 feet; thence South 46°11'57" East a <br /> distance of 50.00 feet to an intersection with the <br /> northwesterly margin of the Diagonal Way (Broadway <br /> Cut-off); said point being on the arc of a curve, the <br /> center of said curve bearing North 46°11'57" West; <br /> thence Northwesterly along said margin, and the arc of <br /> a curve to ghe left with a radius of 1810 feet, a central <br /> angle of 21 39'55", and an arc distance of 684.41, to an <br /> intersection with the Nocth line of said subdivision; said <br /> point bearing North 89 45'53" East from the Point of <br /> Beginning; thence South 890 <br /> 45'53" West along said <br /> North line a distance of 223.81 feet to the Point of <br /> Beginning; <br /> All situated in the County of Snohomish, State of Washington. <br /> TOTAL $293,131.74 <br />