My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2107 LOMBARD AVE 2022-02-18
>
Address Records
>
LOMBARD AVE
>
2107
>
2107 LOMBARD AVE 2022-02-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 2:13:59 PM
Creation date
8/1/2017 12:04:37 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2107
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NGINEERING / PUBLIC SERVICES DEPARTMENT <br />October 9, 2006 <br />Leonides Stratis <br />2107 Lombard <br />Everett, WA 98201 <br />Subject: Project: <br />Job Address: <br />Plan Check No: <br />Dear Mr. Stratis: <br />Stratis <br />2107 Lombard <br />C0608-035 <br />In response to your application for a construction permit, your plans have been <br />examined and you are advised that the issuance of a permit is being withheld for the <br />reasons listed below. These comments address building issues only. Additional <br />revisions or additions may be required by other departments (such as Utilities, Planning <br />or Fire). All references refer to the 2003 International Residential Code, as amended <br />by the State of Washington and/or Washington State Energy Code 2004 Edition, and <br />adopted by the City of Everett, unless stated otherwise. <br />In order for the processing of your application to continue, it will be <br />necessary to provide the Building Division with two complete new sets <br />of drawings reflecting the corrections requested. <br />1. Walls designated as bearing walls (Page 8) require a footing (Page 7). The <br />footings shown do not match the locations of the bearing walls. <br />2. Shear walls designated on Page 8 should have footings. <br />3. Provide all dimensions on foundation plan. <br />4. Provide header size(s) at all openings in bearing walls. <br />5. Detail "A" on Sheet 11 shows concrete over foundation stem wall. If settling <br />occurs in fill under slab, slab will crack and break. Specify fill to be <br />compacted and specify steel (welded wire mesh?) in slab. <br />Please prepare a response letter showing where each item in this correction letter is <br />addressed on the plan set. <br />CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />DEDI/PLNCKMSTR/HEILMAN/C0608-035 (2107 LOMBARD) <br />
The URL can be used to link to this page
Your browser does not support the video tag.