My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3025 LOMBARD AVE 2017-08-02
>
Address Records
>
LOMBARD AVE
>
3025
>
3025 LOMBARD AVE 2017-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2017 8:22:35 AM
Creation date
8/2/2017 8:22:18 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3025
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ,�i : <br /> ; <br /> � <br /> `a � � ����/��— v,�/ <br /> BOGARD ENGINEERS, PS <br /> MECHANICAL ENGINEERING CONSULTANTS <br /> May 21, 2010 <br /> City of Everett Public Works <br /> Engineering/Public Works Division <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Attn: Meg Haley <br /> Re: Everett Senior Activities Center— Building Department Review Comments <br /> Meg, <br /> Following up on our phone conversation yesterday, I have provided the additional <br /> information you have requested. I have also summarized the present status of the items <br /> listed in your April 28 review letter. <br /> Mechanical Review: <br /> Item 1 : Issue closed. <br /> Item 2: ACU-2 has a total cooling capacity 9,500 Btu/h and does not require an <br /> economizer per WSEC 1423. A sketch of the revised schedule showing the <br /> corrected column heading is listed below. <br /> DUCTLESS AC UNIT SCHEDULE <br /> � EIECTiOCAL U(%10 SUCIDI <br /> EN�D.' SER�VEA X�iURNiON �TM �t CiY �L O110U�E1� fDOUi INf OUIGOOR lNf IEAACEAAN� IEFIefIpANi FCMARIS <br /> � YOL15.PM ICA Y0.1S PH 11G YOF SQE.�L 42E.N. <br /> ALV-� IEJ01 BM tK1 11D1M� 4.500 13.0 100 WISl�9�YS-W➢M1 Y751194�W�AOpMI 115,1 11 115,1 14 1S 1/4' 3/6' <br /> Item 3: I have referred your suggestion to contact the planning department to verify <br /> review of the screening has been completed to the architect. <br /> Type 1 Hood Review: <br /> Item 1 a: Duct materials are specified to meet the requirements of IMC Section <br /> 506.3.1.1. The information has been added to Sketch M-5 attached below. <br /> Issue Closed. <br /> Item 1 b: Issue closed. <br /> Item 1 c: Issue closed <br /> 22121 17T"Avenue SE, Suite 111, Bothell, WA 98021 - PH 425-415-6100 - FAX 425-415-6100 <br /> ;; <br />
The URL can be used to link to this page
Your browser does not support the video tag.