My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 SOUND AVE 2017-08-02
>
Address Records
>
SOUND AVE
>
5109
>
5109 SOUND AVE 2017-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2017 1:15:47 PM
Creation date
8/2/2017 1:15:31 PM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 21, 2014 <br /> Two Single-Family residences <br /> L&A Job No. 14-065 <br /> Page 24 <br /> The infiltration trenches should be at least 24 inches wide. The side walls of the trenches <br /> sllould be lined with a layer of non-woven filter fabric, such as MIRAFI 140NS. The <br /> trenches are then filled with clean, 3/4 to 1-1/2 inch, washed gravel or crushed rock to <br /> within about 10 inches of the finish grade. The dispersion pipes should be constructed of <br /> 4-inch rigid PVC pipes and laid ]evel in the gravel or crushed rock filled trenches at about <br /> 16 inches below the top of trenches. The top of the gravel or crushed rock fill should also <br /> be covered with the filter fabric liner. The remaining trenches should then be backfilled <br /> with compacted onsite clean soils. The gravel or crushed rock fill should be placed in <br /> lifts no more than 10 inches thick in loose state, with each lift compacted to a non- <br /> yielding state with a vibratory mechanical compactor. The compaction and densification <br /> of trench fill is critical if it is to support driveways. Stormwater captured over paved <br /> driveways should be routed into a catch basin equipped with an oil-water separator before <br /> being released into the inf ltration trenches. <br /> RISK EVALUATION STATEMENT <br /> It is our opinion that if the recommendations in this report are fully implemented and <br /> observed during construction and following the completion of construction, the areas <br /> disturbed by construction will remain stable and will not increase the potential for soil <br /> movement. In our opinion, the risk for damages to the proposed development and from <br /> the development to adjacent properties from soil instability should be minimal. <br /> LIMITATIONS <br /> This report has been prepared for the specific application to this project for the exclusive <br /> use by Belmark, LLC, and its associates, representatives, consultants and contractors. We <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.