Laserfiche WebLink
,blz ol c �- v <br />Kirk Brooks j�- <br />To: Joe Taflin <br />Subject: RE: Powdermill Phase 2- Revised South Wall <br />Joe, I've reviewed this with The Public Works inspector and our structural engineering person. We are okay with this <br />change. Proceed as per the new submittal. Kirk <br />From: Joe Taflin [mailto:joe@pacland.com] <br />Sent: Thursday, August 27, 2015 10:21 AM <br />To: Kirk Brooks <br />Subject: Powdermill Phase 2- Revised South Wall <br />Kirk, <br />We tweaked the south wall for Powdermill Phase 2, swapping out a rockery for an Ultra block wall designed by the <br />geotech (Terra Assoc). Wall heights generally decreased a bit, and slopes behind the wall increased and tie into the <br />Crista site at the PL, and there's a new wall detail. <br />Not a major change but I wanted to make sure you were aware. Please let me know if you have any comments or <br />questions. Regards, <br />Joe Taflin, P.E.X, LEED AP <br />Engineering & Development <br />Consulting Services <br />11400 SE 8th St, Suite 345 1 Bellevue, WA 98004 <br />Office: (425) 453-9501 x1515 I Cell: (206) 683-0108 <br />*WA, TX, NE, MN <br />