Laserfiche WebLink
INSPECTION REPORT@4L' <br />Date: V Permi : \0 V <br />Contractor: <br />Owner: <br />Site Address: 162-05VV <br />zo \ <br />TYPE OF INSPECTION REQUESTED <br />BUILDING MECHANICAL PLUMBING <br />❑ Temp ervice ❑ LIFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br />❑ Groundwork ❑ Footing ❑ Rough In ❑ Rough In <br />❑ Slab/Conduit ❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Rough In ❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service ❑ Framing ❑ Rooftop Units ❑ Water Service <br />❑ Grounding ❑ Insulation ❑ Mechanical Final ❑ Medical Gas <br />❑ Ceiling Grid ❑ Drywall Nailing ❑ Plumbing Final <br />❑ Electrical Final ❑ Shear Nailing GAS PIPE <br />SITE WORK ❑ Roof Nailing ❑ Rough In/Service Hot Water Tank <br />❑ Footing drains ❑ Ceiling Grid ❑ Refrigeration ❑ Rough In <br />❑ Roof drains ❑ Building Final ❑ Gas Pipe Final ❑ HWT Final <br />OTHER OR CONSULTATION: <br />❑ APPROVAL ❑ ARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ORRECTION REQUESTED ❑ <br />❑ OK FOR C.O. VIOLATION <br />❑ UNABLE TO PERFOR INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION - 24 hour notice required <br />Inspector: Date: <br />EIR (4/09) r RMS h PROMOTIONS az;/ana-t iun <br />