My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2606 100TH ST SE 2017-08-03
>
Address Records
>
100TH ST SE
>
2606
>
2606 100TH ST SE 2017-08-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2017 8:50:59 AM
Creation date
8/3/2017 8:50:34 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
2606
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> � Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> � oftop run must be � c ed t a f downs ou �nfiltratio system r City of v�rett Storm <br /> Man - .6.2. proxima e size trenc �s ,.. wide, ' p and 25' lori . attachment for <br /> :. _. ._ <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Randy Allen at 425-339-7403 //Call Cliff Lindman at 425-339-7404. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12 Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14� No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> open for pedestrian travel. <br /> 16. � Adjust water meter box 1" above sidewaik grade. <br /> 17 Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 19. Pave driveway from the front property line out to the street paving. <br /> 20. Pave to existing paving in alley. <br /> 21. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 22. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> yravity flow across the public right-of-way. <br /> 'L4. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br /> 13D. <br /> PWComments/Revised 618111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.