My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Transportation Improvement Board 2/29/2016
>
Contracts
>
Agreement
>
Interlocal Agreements
>
WA ST Transportation Improvement Board 2/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:20 AM
Creation date
8/4/2017 10:46:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA State Transportation Improvement Board
Approval Date
2/29/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Fuel Tax Grant Downtown Sceetscape
Tracking Number
0000806
Total Compensation
$7,629,502.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation Improvement Board *it Et <br /> Complete Streets Work Plan Il91111 6 CO <br /> Complete; Srleeis Award <br /> Agency City of Everett <br /> Agency Contact Richard Tarry <br /> Phone 425.257-8922 Email rtarry@everettwa.gov Complete Total WorkPlan <br /> $250,000 <br /> Proposed Work Item Description Complete Streets Estimated <br /> Funding Completion Year <br /> Design and Construct a Bicycle Signed Route that links <br /> Regional Bicycle Network Link the Downtown Bike Lanes on Hoyt Avenue with the $ 90,000 2018 <br /> Interurban Regional Trail at 41st &Colby <br /> Hewitt Avenue Pedestrian Assist with the construction of pedestrian improvements <br /> associated with a planned Everett Massacre historic $ 75,000 2020 <br /> Improvements memorial. <br /> Pedestrian Improvements linking the Forgotten Creek <br /> Bond Street to Terminal Avenue Trailhead at Bond Street to the Terminal Avenue Bridge $ 75,000 2019 <br /> to enhance pedestrian waterfront access <br /> 19th Street Bike Lane Enhancement Add signs and markings to the bike lanes on 19th Street $ 10,000 2017 <br /> linking Jackson Park to the Downtown Bike Lanes <br /> Agency Certification TIB Approval <br /> Certification Is hearhy given that the proposed work plan represents <br /> Ah4 <br /> projects that support and reflect our commitment to the Complete �: l <br /> Streets or ce and ethic. Project Engineer Review Date <br /> I Z-Z 7-2a/4, Engineering Manager 'Re Date t 4-f /G <br /> Signature of Authorized Agency Official Date <br /> j` d,,4 ..5•,as� G g vt. y Finance Manager ASl Date k 2\2'` ( 1 1° <br /> Agency Official me&Title <br /> Complete Streets Work Plan-are OF EVERETT.xis\Workplan • <br /> Revised Dec 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.